Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 70 Multimodal Corridor Study <br /> D.9.1: Reduce posted speed limit on <br /> US 70 to 35 miles per hour between n/a Safety Auto <br /> McBane Store Road and NC 751. <br /> • • • D.9.2: Reduce posted speed limit on <br /> Lawrence Road to 35 miles per hour <br /> between US 70 and Palmers Grove n/a Safety Auto <br /> Church Road. <br /> D.10.1: Establish a maintenance <br /> agreement between NCDOT and n/a Mobility, Ped <br /> Orange County for new and existing Safety <br /> D.10: Extend pedestrian facilities on US 70. <br /> sidewalk <br /> connectivity to D.10.2: Require developers building <br /> anticipated growth on land parcels fronting US 70 to <br /> either construct sidewalk along their n/a Mobility, Ped <br /> frontages, dedicate ROW for future Safety <br /> construction, or pay in lieu. <br /> D.11.1: Upgrade the intersection of US NCDOT Safety, <br /> gateways to 70, US 70 Business, and Palmer's STIP, Local Placemaking Intersection <br /> Hillsborough. Grove Church Road to a roundabout. <br /> D.12: Improve the D.12.1: Construct sidewalk and <br /> permeability of US protected bicycle route on the entirety NCDOT Mobility, <br /> 70 as a barrier of Orange High School Road; connect STIP, Local Safety, Bike, Ped <br /> within to Caine Street across US 70 along Placemaking <br /> Hillsborough. parcel lines. <br /> 145 Implementation and Funding <br />
The URL can be used to link to this page
Your browser does not support the video tag.