Orange County NC Website
US 70 Multimodal Corridor Study <br /> Potential <br /> • . Goals <br /> J= Source Type <br /> D.3.1: Conduct NCDOT Municipal �I <br /> D.3: Manage travel School Transportation Assistance <br /> • (MSTA) school study to address NCDOT <br /> from 91 circulation, queuing, and storage STIP Mobility Auto <br /> from • • needs specific to Orange High and <br /> Middle School complex. <br /> D.4.1: Increase the frequency and <br /> • service hours of Orange County's TPM Grant Mobility Transit <br /> reliability.service Orange-Alamance Connector and <br /> Hillsborough Circulator routes. <br /> D.5.1: Update all existing bus stops to <br /> D.S: Improve accessibility and safety standards, <br /> accessibility of complete with shelters, seating, Mobility, <br /> lighting, visible and audible TPM Grant Safety Ped, Transit <br /> information, and appropriate <br /> pedestrian and ADA connectivity. <br /> 13.6: Construct D.6.1:Add an accessible, safe bus <br /> accessible bus shelter with appropriate pedestrian Mobility, <br /> shelters that serve connectivity on Orange High School TPM Grant Safety,Job Ped, Transit <br /> Road that serves Orange High School. Access <br /> employment <br /> D.7: Construct D.7.1:Add an accessible, safe bus Mobility, <br /> accessible bus shelter with appropriate pedestrian TPM Grant Safety,Job Ped, Transit <br /> connectivity on Miller Road. Access <br /> D.7.2:Add an accessible, safe bus Mobility, <br /> residential —9 shelter with appropriate pedestrian TPM Grant Safety,Job Ped, Transit <br /> communities. 9 connectivity on Scotswood Boulevard. Access <br /> •.8:Accommodate D.8.1: Include a 10-foot shared-use <br /> all <br /> ath on <br /> he <br /> e and a 5-foot <br /> • •transportation <br /> , ,• ssiidewalkton the south outd NCDOT Mobility, <br /> h side of US 70 Bike, Ped <br /> , <br /> improvement <br /> from NC 86 to Palmers Grove Church STIP Safety <br /> projects. Road. <br /> 144 Implementation and Funding <br />