Orange County NC Website
US 70 Multimodal Corridor Study <br /> A.3.1: Update all existing bus stops to <br /> • accessibility and safety standards, <br /> • complete with shelters, seating, Mobility, <br /> lighting, visible and audible TPM Grant Safety Ped, Transit <br /> • • information, and appropriate <br /> pedestrian and ADA connectivity. <br /> ConstructaccessibleA.4.1:Add two accessible, safe bus <br /> shelters that serve shelters with appropriate pedestrian Mobility, <br /> TPM Grant Safety,Job Ped, Transit <br /> • • connectivity that serve businesses on Access <br /> employmentOakwood Street and Industrial Drive. <br /> A.5.1:Add accessible, safe bus shelters Mobility, <br /> either side of US 70 with appropriate Safety, <br /> ConstructTPM Grant Ped, Transit <br /> accessible bus pedestrian connectivity that serves Natural <br /> Mebane Community Park. Environment <br /> A.5.2:Add accessible, safe bus shelters <br /> recreation either side of US 70 with appropriate Mobility, <br /> destinations. TPM Grant <br /> pedestrian connectivity that serves Safety Ped, Transit <br /> Mebane Memorial Garden. <br /> A.6.1:Add accessible, safe bus shelters <br /> either side of US 70 with appropriate Mobility, <br /> A.6:Construct TPM Grant Safety,Job Ped, Transit <br /> accessible bus pedestrian connectivity that serves the <br /> Access <br /> Supper Club mobile home community.shelters that serve <br /> A.6.2:Add an accessible, safe bus <br /> residential shelter with appropriate pedestrian Mobility, <br /> communities. TPM Grant <br /> connectivity across US 70 from the Safety Ped, Transit <br /> existing Ashbury Blvd. stop. <br /> A.7.1: Construct a minimum 5-foot <br /> transportation Mobility,� � � � sidewalk on north side of US 70 from Private, SS4A Ped <br /> way 91" Street to Ashbury Blvd Safety <br /> improvement <br /> 131 Implementation and Funding <br />