Orange County NC Website
US 70 Multimodal Corridor Study <br /> o C.7.2:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing Faucette Mill Road/Cornelius Street stop. <br /> o C.7.3:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing US 70/Rainey Avenue stop. <br /> Relevant Plan Goals: <br /> Goal 3: Improve transit accessibility <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> Goal 7: Work towards Vision Zero. <br /> 4AGoal 8: Reduce pedestrian-automobile conflicts. <br /> 5.4.1.7 Construct accessible bus shelters that serve Hillsborough's residential communities. <br /> o C.8.1: Replace Lakeshore Drive stop with a stop serving Bennetts Mobile Home Park and <br /> surrounding communities. <br /> o D.7.1: Add an accessible, safe bus shelter with appropriate pedestrian connectivity on Miller <br /> Road. <br /> o D.7.2: Add an accessible, safe bus shelter with appropriate pedestrian connectivity on <br /> Scotswood Boulevard. <br /> o F.6.1:Add an accessible, safe bus shelter with appropriate pedestrian connectivity near <br /> Orange Grove Road and Elfin Boulevard. <br /> Relevant Plan Goals: <br /> AkGoal 3: Improve transit accessibility. <br /> AkGoal 6: Increase the comfort of non-automobile roadway users. <br /> 119 Recommendations <br />