Orange County NC Website
US 70 Multimodal Corridor Study <br /> Goal 9: Improve multimodal access to jobs within the corridor. <br /> M EBAN E PROPOSED IMPROVEMENTS <br /> LXISTING INFRASTRUCTURE <br /> j Existing Bus Stop <br /> u <br /> i <br /> I 70 <br /> 119 <br /> O V <br /> Vndustrial➢r _ <br /> l <br /> �1 <br /> N <br /> fs <br /> Figure 31 US 70 Recommended Public Transit Infrastructure Improvements, Segements A/B <br /> 5.4.1.2 Construct accessible bus shelters that serve Mebane's recreation destinations. <br /> o A.5.1: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian <br /> connectivity that serves Mebane Community Park. <br /> o A.5.2: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian <br /> connectivity that serves Mebane Memorial Garden. <br /> Relevant Plan Goals: <br /> Goal 3: Improve transit accessibility <br /> 5.4.1.3 Construct accessible bus shelters that serve Mebane's residential communities. <br /> o A.6.1: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian <br /> connectivity that serves the Supper Club mobile home community. <br /> o A.6.2: Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing Ashbury Blvd. stop. <br /> 116 Recommendations <br />