Orange County NC Website
US 70 Multimodal Corridor Study <br /> 4AGoal 7: Work towards Vision Zero. <br /> 5.3.1.7 Further connect the trail system to the urban active transportation network. <br /> o F.14.1: Connect Mountains-to-Sea trail to US Business with a shared-use path via Elizabeth <br /> Brady Road. <br /> Relevant Plan Goals: <br /> Goal 11: Improve multimodal access to parks throughout the corridor. <br /> �\ Bike/Ped Improvement <br /> `tea <br /> M Bike Improvement <br /> FH6TII\FG INFRASTRUCTURE <br /> T-1 <br /> RL <br /> m <br /> n <br /> Ps 1 roi <br /> � P <br /> L <br /> J <br /> 70 <br /> DURHAM <br /> .J ice•- <br /> 14P <br /> N ] <br /> .S <br /> Figure 30 Recommended Complementary Bike/Ped Improvements, Segment E <br /> 5.3.2 Policy Measures <br /> 5.3.2.1 Extend sidewalk connectivity to anticipated growth areas. <br /> o A.9.1/13.11.1/C.11.1/D.10.1/E.4.1/F.9.1: Establish a maintenance agreement between NCDOT <br /> and Orange County for new and existing pedestrian facilities on US 70. <br /> o A.9.2/13.11.2/C.11.2/D.10.1/E.4.1/F.9.1: Require developers building on land parcels fronting US <br /> 70 to either construct sidewalk along their frontages, dedicate ROW for future construction, <br /> or pay in lieu. <br /> 114 Recommendations <br />