Orange County NC Website
US 70 Multimodal Corridor Study <br /> Relevant Plan Goals: <br /> Goal 2: Prioritize bicycle and pedestrian connectivity through the corridor. <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> PROP05EI]IMPROVFMFNTS <br /> M Blke Improvement <br /> 1'19 EXISTING INFRASTRUCTURE <br /> —Sidewalk <br /> •• Planned sidewalk <br /> —Trail <br /> •• Planned Protected Bike Facility <br /> 1 —Planned Designated Bike Rohe <br /> J <br /> ■ <br /> �f■ <br /> ME BANE <br /> V � <br /> t <br /> N <br /> � Mllas <br /> Figure 28 Recommended Complementary Bike/Ped Improvements, Segments A/B <br /> 110 Recommendations <br />