Orange County NC Website
US 70 Multimodal Corridor Study <br /> PROPOSED IMPROVFMFNTS <br /> L�Pedestrian Connectivity Priority <br /> 119 <br /> 70 <br /> MEBAIVE <br /> HILLS BOROUGH <br /> �f a <br /> * 86 <br /> i <br /> J <br /> N <br /> Figure 27 US 70 Recommended TOD Improvements <br /> 5.3.1 Complementary Bike/Ped Improvements <br /> 5.3.1.1 Establish alternative east-west bicycle routes to US 70 between Mebane and Hillsborough. <br /> o A.1.1: Develop protected bicycle route on Holt Street from Tate Avenue to 1It Street. <br /> o A.1.2: Install signage to encourage bicycle use along E.Washington Street and Lebanon Road. <br /> o A.1.3: Develop protected bicycle route on Washington Street from Sargents Path to Buckhorn <br /> Road. <br /> o B.4.1: Develop protected bicycle route on Lebanon Road from Doe Run Road to Old Paths <br /> Trail. <br /> o B.4.2: Develop protected bicycle route along Richmond Road from Lebanon Road to Efland- <br /> Cheeks Park and Community Center; connect the route south across US 70 to shared-use <br /> path proposed to run parallel to 140. <br /> o C.4.1:Add sharrows and signage to establish bike route along the length of Faucette Mill <br /> Road north of the Hillsboro Town border. <br /> o C.4.2: Construct an off-road bicycle path that connects Faucette Mill Road with Lebanon Road <br /> across the Eno River. <br /> 109 Recommendations <br />