Orange County NC Website
US 70 Multimodal Corridor Study <br /> 5.3.1.3 Enhance downtown Mebane's sense of place. <br /> o A.11.1: Invest in streetscaping projects between Charles and Ninth Streets. <br /> Relevant Goals: <br /> /WwAyr Goal 4: Guide transportation investment to protect community character. <br /> Goal 5: Prioritize pedestrian, bicycle, and transit connectivity within urban areas. <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> Goal 7: Work towards Vision Zero. <br /> 5.3.1.4 Complete the sidewalk contiguity in downtown Mebane. <br /> o A.12.1: Maintain existing sidewalk on US 70's north side between Mebane Community Park <br /> and 9t" Street. <br /> o A.12.2: Combine and minimize curb cuts and wide, flush frontages as parcels redevelop. <br /> Relevant Goals: <br /> /WwApp <br /> Goal 4: Guide transportation investment to protect community character. <br /> /WwAyp <br /> Goal 5: Prioritize pedestrian, bicycle, and transit connectivity within urban areas. <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> J& Goal 8: Reduce pedestrian-automobile conflicts. <br /> 107 Recommendations <br />