Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 70 Multimodal Corridor Study <br /> 5.3 Bicycle and Pedestrian Improvements <br /> 5.3.1 US 70 Bike/Ped Improvements <br /> 5.3.1.1 Accommodate all transportation modes in roadway improvement projects. <br /> o A.7.1: Construct a minimum 5-foot sidewalk on north side of US 70 from 9t" Street to Ashbury <br /> Blvd. <br /> o A.7.2: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south <br /> side of US 70 from McBane Store Road to Buckhorn Road to accompany the long-term typical <br /> section widening; install bicycle pattern rumble strips in the short-term. <br /> o B.8.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south <br /> side of US 70 from Buckhorn Road to Lloyds Dairy Road to accompany the long-term typical <br /> section widening; install bicycle pattern rumble strips in the short-term. <br /> o B.8.2 Install high visibility signs along US 70 indicating presence of cyclists between Tinnin <br /> Road and Gaines Chapel Road. <br /> o B.8.3: Revise the US 70/Buckhorn Road realignment to include a 5-foot paved shoulder with <br /> bicycle pattern rumble strips. <br /> o C.9.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south <br /> side of US 70 from Lloyd's Dairy Road to NC 86. <br /> o D.8.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south <br /> side of US 70 from NC 86 to Palmers Grove Church Road. <br /> o E.2.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south <br /> side of US 70 from Palmers Grove Church Road to NC 751; in the short term, widen shoulders <br /> to accommodate minimum 5-foot paved shoulder with bicycle pattern rumble strips. <br /> o F.7.1: Construct 5-foot sidewalks on the north and south sides of US 70 Business from NC 86 <br /> to Palmer Grove Church Road. <br /> o F.7.2:Widen the shoulders on US 70 Business from NC 86 to Palmer Grove Church Road to <br /> provide a minimum 5-foot paved shoulder with bicycle pattern rumble strips. <br /> Relevant Goals: <br /> Goal 2: Prioritize bicycle and pedestrian connectivity through the corridor. <br /> Goal 6: Increase the comfort of non-automobile roadway users. <br /> 103 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.