Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 70 Multimodal Corridor Study <br /> o B.13.1: Extend ODX service to the planned Ashwick Drive and Graham Trailer Park mobile <br /> home community stops. <br /> o C.17.1: Extend ODX service to the existing Faucette Mill Road/Cornelius Street, US 70/Rainey <br /> Street, and West Village stops. <br /> o F.13.1: Shift regional transit services to the new US 70 Business location proposed in the NC <br /> 86 Connector Study, Phase/1(2021). <br /> • Construct accessible bus shelters that serve Efland's residential communities (Objective B.7). <br /> o B.7.1: Add accessible, safe bus shelters with appropriate pedestrian connectivity either side of <br /> US 70 that serve communities near Ashwick Drive. <br /> o B.7.2: Add accessible, safe bus shelters with appropriate pedestrian connectivity either side of <br /> US 70 that serve the Graham Trailer Park. <br /> • Introduce and expand park and ride service (Objective C.2). <br /> o C.2.1: Implement the Faucette Mill Road park and ride service proposed in the DCHCMPO CTP <br /> (updated April 2023). <br /> o D.2.1: Implement the Miller Road/Latta Road park and ride service proposed in the <br /> DCHCMPO CTP(updated April 2023). <br /> 5.1.5 Natural Environment Plan <br /> 5.1.5.1 Goal 11: Improve multimodal access to parks throughout the corridor. <br /> To achieve Goal 11, improvement projects should: <br /> • Connect Eno River State Park to US via bicycle infrastructure (Objective D.75/E.7). <br /> o D.15.1:Add sharrows and signage to establish bike route on Lawrence Road from US 70 to <br /> Palmers Grove Church Road. <br /> o E.7.1: Construct protected bike lane on Pleasant Green Road from US 70 to Cole Mill Road. <br /> o E.7.2: Add sharrows and signage to establish bike route on Cole Mill Road from Pleasant <br /> Green Road to the Eno River State Park entrance. <br /> • Further connect the trail system to the urban active transportation network (Objective F.74). <br /> o F.14.1: Connect Mountains-to-Sea trail to US Business with a shared-use path via Elizabeth <br /> Brady Road. <br /> 5.1.5.2 Goal 12: Reduce wildlife-automobile conflicts. <br /> To achieve Goal 12, improvement projects should: <br /> • Designate wildlife crossings where animal strikes are high (Objective E8). <br /> o E.8.1: Develop location for a designated wildlife crossing of US 70 between Seven Springs <br /> Road and Linden Road. <br /> 91 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.