Orange County NC Website
US 70 Multimodal Corridor Study <br /> o F.7.2:Widen the shoulders on US 70 Business from NC 86 to Palmer Grove Church Road to <br /> provide a minimum 5-foot paved shoulder with bicycle pattern rumble strips. <br /> • Extend sidewalk connectivity to anticipated growth areas (Objective A.9/B.11/C.11/D.10/E.4/F.9). <br /> o A.9.1/13.11.1/C.11.1/D.10.1/E.4.1/F.9.1: Establish a maintenance agreement between NCDOT <br /> and Orange County for new and existing pedestrian facilities on US 70. <br /> o A.9.2/13.11.2/C.11.2/D.10.1/E.4.1/F.9.1: Require developers building on land parcels fronting US <br /> 70 to either construct sidewalk along their frontages, dedicate ROW for future construction, <br /> or pay in lieu. <br /> • Modernize existing US 70 pedestrian crossings in downtown Mebane (Objective A.70). <br /> o A.10.1: Modernize the US 70/3rd Street intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, <br /> and high-visibility markings. <br /> o A.10.2: Modernize the US 70/41" Street intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, <br /> and high-visibility markings. <br /> o A.10.3: Modernize the US 70/51" Street intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, <br /> and high-visibility markings. Coordinate with NCDOT and NCRR to refine design of T-550GC <br /> as shown in Mebane's 51 Street Improvement Traffic Impact Study(August 2022) to maintain <br /> three-lane northbound approach and crosswalk/sidewalk design on the east side, and <br /> replicate that design on the west side. <br /> • Complete the sidewalk contiguity in downtown Mebane (Objective A.72). <br /> o A.12.1: Maintain existing sidewalk on US 70's north side between Mebane Community Park <br /> and 9t" Street. <br /> o A.12.2: Combine and minimize curb cuts and wide, flush frontages as parcels redevelop. <br /> • Construct paired bus stops across US 70 from existing facilities (Objective C.7). <br /> o C.7.1:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing North Carolina Drivers License stop. <br /> o C.7.2:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing Faucette Mill Road/Cornelius Street stop. <br /> o C.7.3:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing US 70/Rainey Avenue stop. <br /> • Improve the safety of pedestrian facilities in the Fairview Neighborhood (Objective C.12). <br /> o C.12.1: Install high-visibility pedestrian crossing signage at the Faucette Mill Road/Torain <br /> Street intersection. <br /> o C.12.2: Include high-visibility crossings in all future sidewalk construction on Faucette Mill <br /> Road, Torain Street, and Rainey Avenue where the pedestrian network would otherwise be <br /> interrupted by roadway. <br /> 87 Recommendations <br />