Orange County NC Website
US 70 Multimodal Corridor Study <br /> o C.13.1: Upgrade the US 70/Lakeshore Drive intersection to a roundabout. <br /> o D.11.1: Upgrade the intersection of US 70, US 70 Business, and Palmer's Grove Church Road <br /> to a roundabout. <br /> o F.10.1: Invest in streetscaping projects on US 70 Business from Tuscarora Drive to US 70 <br /> Bypass. <br /> • Prepare east Orange County for smart growth (Objective E.5). <br /> o E.5.1: Construct reduced conflict intersection configurations from Palmers Grove Church Road <br /> to the 185 interchange. <br /> o E.5.2: Invest in streetscaping projects on US 70 south of 185. <br /> 5.1.2.2 Goal 5: Prioritize pedestrian, bicycle, and transit connectivity within urban areas. <br /> To achieve Goal 5, improvement projects should: <br /> • Modernize existing US 70 pedestrian crossings in downtown Mebane (Objective A.70). <br /> o A.10.1: Modernize the US 70/3'd Street intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, <br /> and high-visibility markings. <br /> o A.10.2: Modernize the US 70/41" Street intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, <br /> and high-visibility markings. <br /> o A.10.3: Modernize the US 70/51" Street intersection with accessible pedestrian signal <br /> heads/pedestals on all corners, leading pedestrian intervals, no right turn on red restrictions, <br /> and high-visibility markings. Coordinate with NCDOT and NCRR to refine design of T-550GC <br /> as shown in Mebane's 51 Street Improvement Traffic Impact Study(August 2022) to maintain <br /> three-lane northbound approach and crosswalk/sidewalk design on the east side, and <br /> replicate that design on the west side. <br /> • Enhance downtown Mebane's sense of place (Objective A.71). <br /> o A.11.1: Invest in streetscaping projects between Charles and Ninth Streets. <br /> o A.11.2: Decrease the speed limit to 25 mph between Charles and Ninth Streets. <br /> • Complete the sidewalk contiguity in downtown Mebane (Objective A.72). <br /> o A.12.1: Maintain existing sidewalk on US 70's north side between Mebane Community Park <br /> and 9t" Street. <br /> o A.12.2: Combine and minimize curb cuts and wide, flush frontages as parcels redevelop. <br /> • Improve the safety of pedestrian facilities in the Fairview Neighborhood (Objective C.72) <br /> o C.12.1: Install high-visibility pedestrian crossing signage at the Faucette Mill Road/Torain <br /> Street intersection. <br /> o C.12.2: Include high-visibility crossings in all future sidewalk construction on Faucette Mill <br /> Road, Torain Street, and Rainey Avenue where the pedestrian network would otherwise be <br /> interrupted by roadway. <br /> 79 Recommendations <br />