Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 70 Multimodal Corridor Study <br /> o C.3.1: Extend PART Route 4 service to existing North Carolina Drivers License and Orange <br /> County Courthouse stops. <br /> • Construct paired bus stops across US 70 from existing facilities (Objective C.7). <br /> o C.7.1:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing North Carolina Drivers License stop. <br /> o C.7.2:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing Faucette Mill Road/Cornelius Street stop. <br /> o C.7.3:Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing US 70/Rainey Avenue stop. <br /> • Construct accessible bus shelters that serve Hillsborough's residential communities (Objective <br /> C.8/D.7/F.6). <br /> o C.8.1: Replace Lakeshore Drive stop with a stop serving Bennetts Mobile Home Park and <br /> surrounding communities. <br /> o D.7.1: Add an accessible, safe bus shelter with appropriate pedestrian connectivity on Miller <br /> Road. <br /> o D.7.2: Add an accessible, safe bus shelter with appropriate pedestrian connectivity on <br /> Scotswood Boulevard. <br /> o F.6.1:Add an accessible, safe bus shelter with appropriate pedestrian connectivity near <br /> Orange Grove Road and Elfin Boulevard. <br /> • Construct accessible bus shelters that serve Hillsborough's employment centers (Objective D.6/F.5). <br /> o D.6.1: Add an accessible, safe bus shelter with appropriate pedestrian connectivity on Orange <br /> High School Road that serves Orange High School. <br /> o F.5.1:Add an accessible, safe bus shelter with appropriate pedestrian connectivity near NC 86 <br /> and Cornerstone Court. <br /> co <br /> 5.1.2 Placemakin Plan <br /> 9 <br /> 5.1.2.1 Goal 4: Guide transportation investment to protect community character. <br /> To achieve Goal 4, improvement projects should: <br /> • Enhance downtown Mebane's sense of place (Objective A.71). <br /> o A.11.1: Invest in streetscaping projects between Charles and Ninth Streets. <br /> o A.11.2: Decrease the speed limit to 25 mph between Charles and Ninth Streets. <br /> • Complete the sidewalk contiguity in downtown Mebane (Objective A.72). <br /> o A.12.1: Maintain existing sidewalk on US 70's north side between Mebane Community Park <br /> and 9t" Street. <br /> o A.12.2: Combine and minimize curb cuts and wide, flush frontages as parcels redevelop. <br /> • Establish gateways to Hillsborough (Objective C73/D.77/F.70). <br /> 78 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.