Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 70 Multimodal Corridor Study <br /> o A.2.3: Increase the frequency and service hours of PART's Route 4. <br /> • Improve the accessibility of existing bus stops (Objective A.3/B.6/C.6/D.5/F.3). <br /> o A.3.1/B.6.1/C.6.1/D.6.1/F.4.1: Update all existing bus stops to accessibility and safety <br /> standards, complete with shelters, seating, lighting, visible and audible information, and <br /> appropriate pedestrian and ADA connectivity. <br /> • Construct accessible bus shelters that serve Mebane's employment centers (Objective A.4). <br /> o A.4.1: Add two accessible, safe bus shelters with appropriate pedestrian connectivity that <br /> serve businesses on Oakwood Street and Industrial Drive. <br /> • Construct accessible bus shelters that serve Mebane's recreation destinations (Objective A.5). <br /> o A.5.1: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian <br /> connectivity that serves Mebane Community Park. <br /> o A.5.2: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian <br /> connectivity that serves Mebane Memorial Garden. <br /> • Construct accessible bus shelters that service Mebane's residential communities (Objective A.6). <br /> o A.6.1: Add accessible, safe bus shelters either side of US 70 with appropriate pedestrian <br /> connectivity that serves the Supper Club mobile home community. <br /> o A.6.2: Add an accessible, safe bus shelter with appropriate pedestrian connectivity across US <br /> 70 from the existing Ashbury Blvd. stop. <br /> • Expand transit by partnerships with service providers in Alamance County (Objective A.13). <br /> o A.13.1: Incorporate planned stops at Oakwood Street and Industrial Drive into the future <br /> Mebane Circulator route. <br /> o A.13.2: Expand transit service offerings, such as on-demand service, for Mebane's suburbs, <br /> specifically to align with fixed route buses in Alamance County. <br /> • Expand transit by partnerships with service providers in Orange County (Objective <br /> A.74/B.72/C.75/D.73/E.6/F.7 7). <br /> o A.14.1: Extend Orange-Alamance Connector service to the planned Mebane Community Park <br /> and Supper Club Road mobile home community stops. <br /> o A.14.2: Expand transit service offerings, such as on-demand service, for Mebane's suburbs, <br /> specifically to align with fixed route buses in Orange County. <br /> o A.14.3: Extend Orange-Alamance Connector service to existing Ashbury Boulevard stop. <br /> o B.12.1: Extend Orange-Alamance Connector service to the planned Ashwick Drive, Graham <br /> Trailer Park, and Mebane Memorial Garden stops. <br /> o B.12.3: Introduce and expand on-demand transit services for rural communities around <br /> Efland, specifically to align with fixed route buses. <br /> o CA 5.1: Extend Orange-Alamance Connector service to the existing Faucette Mill/Cornelius <br /> Street, Hillsborough Police Station, and West Village stops. <br /> 76 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.