Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 70 Multimodal Corridor Study <br /> • Manage travel demand for future development in the Efland-Buckhorn-Mebane economic <br /> development area (Objective B.3). <br /> o B.3.1: Implement and regularly update the Efland-Buckhorn-Mebane Access Management Plan <br /> (updated 2019). <br /> o B.3.2: Update the Efland-Buckhorn-Mebane Access Management Plan to include pedestrian, <br /> bicycle, and transit connectivity recommendations. <br /> • Manage travel demand resulting from trips to and from schools (Objective D.3). <br /> o D.3.1: Conduct NCDOT Municipal School Transportation Assistance (MSTA) school study to <br /> address circulation, queuing, and storage needs specific to Orange High and Middle School <br /> complex. <br /> 5.1.1.2 Goal 2: Prioritize bicycle and pedestrian connectivity through the corridor. <br /> To achieve Goal 2, improvement projects should: <br /> • Establish alternative east-west bicycle routes to US 70 between Mebane and Hillsborough (Objective <br /> A.7/B.4/C.4). <br /> o A.1.1: Develop protected bicycle route on Holt Street from Tate Avenue to 1It Street. <br /> o A.1.2: Install signage to encourage bicycle use along E.Washington Street and Lebanon Road. <br /> o A.1.3: Develop protected bicycle route on Washington Street from Sargents Path to Buckhorn <br /> Road. <br /> o B.4.1: Develop protected bicycle route on Lebanon Road from Doe Run Road to Old Paths <br /> Trail. <br /> o B.4.2: Develop protected bicycle route along Richmond Road from Lebanon Road to Efland- <br /> Cheeks Park and Community Center; connect the route south across US 70 to shared-use <br /> path proposed to run parallel to 140. <br /> o C.4.1:Add sharrows and signage to establish bike route along the length of Faucette Mill <br /> Road north of the Hillsboro Town border. <br /> o C.4.2: Construct an off-road bicycle path that connects Faucette Mill Road with Lebanon Road <br /> across the Eno River. <br /> • Accommodate all transportation modes in roadway improvement projects (Objective <br /> A.7/B.8/C.9/D.8/E.2/F.7). <br /> o A.7.1: Construct a minimum 5-foot sidewalk on north side of US 70 from 9t" Street to Ashbury <br /> Blvd. <br /> o A.7.2: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south <br /> side of US 70 from McBane Store Road to Buckhorn Road to accompany the long-term typical <br /> section widening; install bicycle pattern rumble strips in the short-term. <br /> o B.8.1: Include a 10-foot shared-use path on the north side and a 5-foot sidewalk on the south <br /> side of US 70 from Buckhorn Road to Lloyds Dairy Road to accompany the long-term typical <br /> section widening; install bicycle pattern rumble strips in the short-term. <br /> 73 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.