Browse
Search
03.18.2024 Outboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
03.18.2024 Outboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:54:56 AM
Creation date
3/14/2024 11:43:13 AM
Metadata
Fields
Template:
BOCC
Date
3/18/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 70 Multimodal Corridor Study <br /> 5.1.1 Mobility Plan <br /> 5.1.1.1 Goal 1: Manage increasing vehicular traffic congestion, including auto, EMS, and freight. <br /> To achieve Goal 1, improvement projects should: <br /> • Reduce automobile congestion delay times in response to projected traffic demand growth through <br /> the corridor(Objective A.15/B.1/C.1/D.1/E 1/F.7). <br /> o A.15.1:Widen US 70 to a four-lane divided facility from McBane Store Road to Buckhorn <br /> Road. <br /> o B.1.1: Widen US 70 to a four-lane divided facility from Buckhorn Road to Lloyds Dairy Road. <br /> o C.1.1:Widen US 70 to a four-lane divided facility throughout Segment C. <br /> o C.1.2: Realign Revere Road approach to the US 70/Faucette Mill Road intersection; reroute <br /> Short Street accordingly. <br /> o C.1.3: Construct/extend exclusive turn lanes on the west- and northbound approaches to the <br /> US 70/Faucette Mill Road intersection. <br /> o CAA Construct exclusive turning lanes at the US 70/NC 86 intersection, including dual <br /> eastbound left turn lanes from US 70 onto NC 86 northbound. <br /> o D.1.1: Widen US 70 to a four-lane divided facility throughout Segment D. <br /> o D.1.2: Extend existing south- and westbound right turn lanes at the US 70/Orange High <br /> School Road intersection <br /> o D.1.3: Upgrade the US 70/N. Scotswood Blvd. intersection to a roundabout. <br /> o E.1.1: Widen US 70 to a four-lane divided facility throughout Segment E. <br /> o E.1.2: Extend turn lanes at the US 70/NC 751 intersection. <br /> o F.1.1: Upgrade the US 70 Business/Lawrence Road intersection to a traffic signal. <br /> o F.1.2: Convert the US 70 Business/Elizabeth Brady Road intersection to a T-intersection with <br /> an adjacent roundabout at NC 86. <br /> o F.1.3: Convert the existing traffic signal at the US 70 Business/NC 86 intersection to a <br /> roundabout, including pedestrian crossing markings and signage. <br /> • Improve access between US 70 and 1 40/1 85 (Objective B.2/F.2). <br /> o B.2.1: Construct exclusive left- and right-turn lanes on all approaches at the US 70/Efland <br /> Cedar Grove Road intersection. <br /> o B.2.2: Redesign the US 70/1 85 Connector interchange to a fully directional at-grade <br /> configuration, such as a "dogbone" roundabout. <br /> o F.2.1: Implement the US 70 Business realignment proposed in the NC 86 Connector Study, <br /> Phase 11(2021), built to complete street standards. <br /> 72 Recommendations <br />
The URL can be used to link to this page
Your browser does not support the video tag.