Orange County NC Website
US 70 Multimodal Corridor Study <br /> Table 12 2050 AM and PM Peak Hour Intersection Level of Service Summary <br /> Traffic No-Build(2050) Traffic No-Build(2050) <br /> ID Intersection and Approach ID Intersection and Approach <br /> Control AM PM Control AM PM <br /> 3`d St&US 70(Center St) C-31.8 B-13.8 Orange High School Rd&US 70 D-42.6 E-71.1 <br /> Eastbound D-47.4 B-17.3 Eastbound C-20.9 B-14.1 <br /> 1 Westbound Signalized C-21.4 A-9.3 8 Signalized <br /> Westbound F-92.8 F-167.3 <br /> Northbound B-14.4 B-15.7 Southbound C-23.6 C-21.4 <br /> Southbound C-22.0 C-27.4 St.Marys Rd&US 70 D-37.5 E-56.4 <br /> 4"St&US 70(Center St) B-17.9 D-45.6 Eastbound C-32.9 B-12.0 <br /> 2 Eastbound Signalized B-17.0 C-28.7 9 Westbound Signalized B-18.3 E-71.4 <br /> Westbound B-19.3 E-61.7 <br /> Northbound B-14.0 B-14.2 Northbound D�0.9 -107. <br /> 5`h St&US 70(Center St) C-29.8 F-95.9 Lawrence <br /> Southbound F-88.1 -126.3 <br /> Eastbound A11.4 A-5.5 Lawrence Rd&US 70 E-75.7 F-126.5 <br /> 3 Westbound Signalized D-39.4 F-149.8 Eastbound E-70.3 C-26.2 <br /> Northbound C-29.9 F-113.8 10 Westbound Signalized B-16.5 E-75.6 <br /> Southbound E-61.9 E-72.3 Northbound F-114.1 F-342.2 <br /> Buckhorn Rd&US 70 B-13.9 C-30.4 ISouthbound F-137.9 I F-141.2 <br /> Eastbound B-19.8 B-12.2 US 70 Bus/Pahners Grove Ch Rd&US 70 <br /> 4 Signalized 11 Northbound Two Way F-717.3 F-4370.3 <br /> Westbound A-5.3 D�1.3 Stop Control <br /> Northbound B-19.3 I C-24.7 Southbound F- F- <br /> EIIand-Cedar Grove Rd&US 70 F-173.9 F-171.5 Mt Herman Ch Rd/Pleasant Gr Rd&US 70 F-130.4 F-109.7 <br /> Eastbound F-164.8 F-104.7 Eastbound F-210.4 D-40.8 <br /> 5 Westbound Signalized F-110.5 F-193.3 12 Westbound Signalized D-35.4 F-155.3 <br /> Northbound F-126.4 F-278.3 Northbound E-68.3 E-70.3 <br /> Southbound F-260.5 C-30.7 Southbound F-102.8 F-95.2 <br /> Revere Rd/Faucette Mill Rd&US 70 F-123.8 C-34.7 NC 751&US 70 B-13.0 C-22.2 <br /> Eastbound F-253.2 C-26.9 Eastbound B-14.7 C-20.9 <br /> 6 Westbound Signalized D-37.3 D-42.8 13 Signalized <br /> Westbound A-5.2 B-17.9 <br /> Northbound D-35.7 C-29.7 Northbound B-19.5 C-31.0 <br /> Southbound D-50.0 D43.7 <br /> NC 86(S Churton St)&US 70 F-179.4 F-124.8 Buckhorn Road Proposed Alignment&US 70 F--216. F F-9.1 <br /> Eastbound F-267.0 F-206.4 Eastbound F-216.6 F-99.1 <br /> 7 Westbound Signalized F-110.5 F-127.5 40 Westbound Signalized D45.6 D 41.6 <br /> Northbound D-39.7 D-44.3 Northbound F-456.4 F-274.3 <br /> Southbound F-219.6 F-115.7 Southbound D-36.8 D-39.8 <br /> 4.3.9 Critical Issues <br /> The table below overviews roadway deficiencies identified during the existing conditions analysis, and <br /> supported by future traffic projections and land use goals, that must be addressed to achieve the plan's goals. <br /> Problem Relevant Goal(s) <br /> Schools in the corridor are significant sources of <br /> congestion. <br /> 1 <br /> Roadway infrastructure in the corridor does not have <br /> the capacity for the future projected traffic demand ' <br /> 1 9, 10 <br /> 48 Existing Conditions and Critical Issues <br />