Browse
Search
02.19.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
02.19.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:47:11 AM
Creation date
3/14/2024 11:42:57 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/10/2024 <br /> North Carolina Department of Transportation <br /> Active Projects Under Construction-Alamance Co. <br /> Contract TIP Location Description Contractor Name Resident Contract Bid Availability Completion Work Start Estimated Progress Completion <br /> Number Number Engineer Amount Date Date Date Completion Schedule Percent <br /> Date Percent <br /> C203844 U-3109A NC-119 RELOCATION FROM 1-40/85 TO SR-1921 THALLE CONSTRUCTION Howell,Bobby J $45,389,069.36 6/26/2017 1/28/2021 8/3/2017 12/6/2023 100.00 100.00 <br /> (MEBANE ROGERS RD/STAGE COACH RD). CO.,INC. <br /> C204438 B-5728 REPLACE BRIDGE#112 OVER REEDY FORK CREEK SMITH-ROWE,LLC Howell,Bobby J $6,733,158.50 5/31/2022 12/12/2024 7/25/2022 2/13/2025 76.00 64.47 <br /> ON NC 87 IN OSSIPEE <br /> C204572 U-6010 INTERSECTION IMPROVEMENTS ON US 70(SOUTH APAC ATLANTIC INC. Howell,Bobby J $13,975,135.25 7/6/2022 1/13/2025 9/29/2022 1/13/2025 70.00 32.89 <br /> CHURCH STREET)AT SR 1226/SR 1311(UNIVERSITY THOMPSON ARTHUR <br /> DRIVE)IN BURLINGTON DIVISION <br /> C204603 1-5711 1-40/1-85 AND SR 1007(MEBANE OAKS ROAD)IN ZACHRY CONSTRUCTION Howell,Bobby J $12,865,732.71 4/26/2021 1/11/2024 4/26/2021 2/15/2024 100.00 94.61 <br /> MEBANE INTERCHANGE IMPROVEMENTS CORPORATION <br /> C204626 RESURFACE 1 SECTION OF NC 87,1 SECTION OF NC FSC 11 LLC DBA FRED Lorenz,PE,Kris $4,639,570.37 6/3/2021 11/1/2022 6/28/2021 11/21/2023 100.00 100.00 <br /> 49 AND 21 SECTIONS OF SECONDARY ROADS SMITH COMPANY <br /> C204788 RESURFACING OF SIX SECONDARY ROADS VECELLIO&GROGAN INC Howell,Bobby J $4,366,972.22 3/15/2023 9/15/2024 3/6/2023 11/10/2023 100.00 100.00 <br /> DBA SHARPE BROTHERS <br /> DG00559 RESURFACE A SECTION OF NC 100,NC 49,US 70&3 BOGGS CONTRACTING, Howell,Bobby J $2,740,478.60 5/1/2022 6/30/2022 5/20/2022 12/4/2023 100.00 100.00 <br /> SECONDARY ROADS IN ALAMANCE COUNTY INC <br /> DG00589 HS-2007C INSTALLATION THERMOPLASTIC PAVEMENT TRP CONSTRUCTION Cvijetic,PE, $1,494,249.58 3/15/2023 11M2023 9/13/2023 2/28/2024 100.00 85.60 <br /> MARKINGS ON VARIOUS SECONDARY ROUTES IN GROUP LLC Bojan <br /> DIVISION 7 <br /> DG00596 R-57871 INSTALLATION OF ADA COMPLIANT CURB RAMPS AT CAROLINA GROUP Howell,Bobby J $312,070.00 10/12/2022 2/28/2024 11/9/2022 10/14/2023 100.00 100.00 <br /> VARIOUS ROUTES PROPERTIES LLC DBA <br /> CAROLINA GROUP <br /> CONTRACTING <br /> DG00630 CULVERT IMPROVEMENTS ON SR 2158(DARRELL CHATHAM CIVIL Howell,Bobby J $874,000,000.00 1/8/2024 9/3/2024 <br /> NEWTON DRIVE) CONTRACTING LLC <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.