Browse
Search
02.19.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
02.19.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:47:11 AM
Creation date
3/14/2024 11:42:57 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> U-6114 Install traffic signal and add turn lanes at NC 62(Alamance 10/16/2029 FY2031 $900,000 Planning and design activities Chris Smitherman <br /> Road)at SR 1155(Hatchery Road)/Bonnie Lane intersection pending <br /> in Burlington <br /> BP7-R016 Replace Bridge#113 on SR 1003(Lindley Mill Road) 11/5/2026 FY2028 $1,200,000 Planning and design activities Vacant <br /> underway-Plans at 65% <br /> B-6052 Replace bridge 68 over NCRR/Norfolk Southern Railroad on 1/18/28 FY2029 $2,500,000 PE funding approved 5/6/19 David Stutts <br /> 48709.1.1 SR 1928(Trollingwood Road)in Haw River <br /> 48709.2.1 <br /> 48709.3.1 <br /> BP7-R018 Replace Bridge#254 on SR 2104(Mandate Road) 8/30/2030 FY2032 $700,000 Planning and design activities Vacant <br /> pending <br /> BP7-R019 Replace Bridge#103 on SR 2182(Perry Road) 10/7/2030 FY2032 $700,000 Planning and design activities Vacant <br /> pending <br /> BP7-R023 Replace Bridge#238 on SR 2128(Old Hillsborough Road) 8/2/2029 FY2031 $700,000 Planning and design activities Vacant <br /> underway <br /> 1-6009 Interchange improvements at 1-40/1-85 and SR 1158 6/20/30 FY2032 $936,000 Planning and design activities Chris Smitherman <br /> 47962.1.1 (Huffman Mitt Road). Construct additional right turn lane on I- pending <br /> 47962.2.1 40 WB Ramp and improve operations at SR 1308(Garden <br /> 47962.3.1 Road)intersection in Burlington <br /> U-6009 Widen and construct center turn lane on US70(West Church 1/15/30 FY2032 $6,337,000 Planning and design activities Chris Smitherman <br /> 47144.1.1 St)from Tarteton Ave.to Fifth Street in Burlington pending <br /> 47144.2.1 <br /> 47144.3.1 <br /> I-6059 Interchange improvements at 1-40/1-85 and SR 1981 1/21/31 FY2033 $12,400,000 Planning and design activities Bryan Key <br /> 48689.1.1 (Troll ingwood-Hawfietds Road)in Mebane pending <br /> 48689.2.1 <br /> 48689.3.1 <br /> BGMPO Jan 2024 <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.