Browse
Search
02.19.2024 OUTboard
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2024
>
02.19.2024 OUTboard
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:47:11 AM
Creation date
3/14/2024 11:42:57 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6207S NC 119 at SR 2135(Jim Minor Road)East of Swepsonville. 10/23/23 11/8/23 $110,000 Project approved by BOT and Dawn McPherson <br /> 51111 Traffic Signal Installation. assigned.Construction and Final <br /> Compliance Complete. <br /> SS-6207R SR 2100(East Gilbreath Street/Cooper Road)at SR 2111 10/16/23 11/14/23 $20,000 Project approved by BOT and Dawn McPherson <br /> 51110 (Checks Lane)/SR 2109(Cooper Road)South of Graham. assigned.Construction and Final <br /> All Way Stop Installation. Compliance Complete. <br /> BR-0060 Replace Bridge#14 on NC 14 over Cane Creek 7/16/24 FY2025 $5,900,000 Planning and design activities David Stutts <br /> underway <br /> EB-5879 Construct sidewalk on US 70(N.Church St.)from SR 1716 9/30/24 FY2026 $200,000 Municipal Agreement required to City of <br /> (Graham Hopedale Road)to SR 1719(Sellars Mill Road) begin work Burlington/Stephen <br /> Robinson <br /> 50547 NC 49 at Green Level Church Road/James Boswell Road- 11/7/24 Spring 2025 $650,000 Planning and design activities Chris Smitherman <br /> Realign Intersection underway <br /> 15BPR.54 Rehab on Structure#197 in Guilford County on SR 1117(S. 1/21/25 FY2028 $5,000,000 Planning and design activities Kristy Alford <br /> Holden Street)over 1-85 Business and on Structure#148 on I- underway <br /> 40 over Haw River in Alamance County <br /> U-5844 Construct multi-lanes on NC62 from SR 1430(Ramada 3/18/25 FY2028 $10,000,000 Planning and design activities Chad Reimakoski <br /> 50234.1.1 Road)to US 70(South Church Street)in Burlington underway-Field Inspection held. In <br /> 50234.2.1 ROW for ROW acquisitions. <br /> 50234.3.1 <br /> U-6014 Widen SR 1716(Graham-Hopedale Rd)to multi-lanes with 5/20/25 FY2027 $13,200,000 Planning and design activities Chad Reimakoski <br /> 47159.1.1 Bicycle/Pedestrian accommodations from SR 1720(West underway, Includes EB-5882. ROW <br /> 47159.2.1 Hanover Rd)to Morningside Drive in Burlington Acquisition underway. <br /> 47159.3.1 <br /> U-6131 Install dual left turn lanes in westbound direction at NC 54 1/15/26 FY2028 $3,500,000 Planning and design activities Chris Smitherman <br /> (W. Harden Street)at NC 49(Maple Ave.)in Burlington pending <br /> EB-5988 Construct sidewalk on Lee Ave./W. Lebanon Ave.to SR 1454 8/25/2026 FY2028 $272,000 Municipal Agreement required to Town of <br /> (W. Haggard Ave.)in Elon begin work Elon/Stephen <br /> Robinson <br /> BGMPO Jan 2024 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.