Orange County NC Website
NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description Let/Start Completion Cost Status Project Lead <br /> Date Date <br /> SM-6107B SR 1167(Longpine Road)at SR 1146(Kirkpatrick Road). 10/9/23 11/8/23 $185,000 Materials are arriving- Installation Dawn McPherson <br /> 50522 Installation of a modular mini-roundabout. is complete. Derek Dixon <br /> SS-6207G NC 87(East Webb Avenue)at Flanner Street, Pedestrian 5/11/23 12/31/23 $60,000 Planning and design activities Dawn McPherson <br /> 50502 signal installation and crosswalk pavement markings. underway. Utility relocations <br /> underway. <br /> HS-2007F NC 87 at 1-40 installation of pedestrian improvements 3/7/24 10/12/23 $86,500 Planning and design activities Dawn McPherson <br /> underway.Construction complete. <br /> EB-5885 Construct sidewalk on US 70(N.Church St.)from Beaumont 9/26/24 FY 2026 $120,000 Municipal Agreement required to City of <br /> Avenue to SR 1716(Graham Hopedale Road) begin work Burlington/Stephen <br /> Robinson <br /> U-6017 Intersection improvements at NC 54(East Harden St.)and 12/21/23 FY2025 $2,100,000 Planning and design activities Chris Smitherman <br /> 47162.1.1 NC 49(East Elm St.)in Graham underway-ROW acquisitions <br /> 47162.2.1 complete-Utility relocations <br /> 47162.3.1 underway-Letting preparations <br /> underway <br /> 17BP.7.C.18 Replace pipe on Swep-Sax Road/Darrell Newton Road 10/19/23 FY2024 $500,000 Letting preparations underway Vacant <br /> U-6013 Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- 3/19/24 FY2026 $6,200,000 Planning and design activities Chris Smitherman <br /> 47158.1.4 Hawfields Rd)/SR 2126(Old Hillsborough Rd)to Lowes Blvd underway, ROW underway and <br /> 47158.2.4 (non-system)in Mebane. utilities to begin soon <br /> 47158.3.4 <br /> 48916 Shift NC 61 and NC 100 intersection in Gibsonville to 12/12/24 FY2027 $650,000 Planning and design activities Chris Smitherman <br /> improve turning radii for trucks underway -ROW underway <br /> AV-5851 Construct 100'paved overrun and make safety 1/22/27 FY29 $2,080,000 Planning and design activities Caleb Whitby <br /> enhancements at the Burlington-Alamance Regional Airport underway <br /> U-6011 Intersection improvements at US 70(South Church Street) 2/15/24 FY2027 $2,400,000 Planning and design activities Chris Smitherman <br /> 47146.1.1 and SR 1158(Huffman Mill Rd)in Burlington underway-ROW Certified. <br /> 47146.2.1 <br /> 47146.3.1 <br /> SS-6207V SR 1963(Holt Street)at SR 1962(S.Third Street).All Way 6/28/24 10/1/24 $32,000 Project approved by BOT and Dawn McPherson <br /> 51270 Stop Installation. assigned. <br /> BGMPO Jan 2024 <br /> Page 1 <br />