Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED IN TARPO- UNDER DEVELOPMENT <br /> TIPIWBS# Description Let/Start Date Completion Cost Status Project Lead <br /> Date <br /> 51130 Eliminate slip ramp on SR 1120(Mt Willing Rd)at SR 1117 12/1/23 Spring 2024 $75,000 Planning and design activities underway Dawn McPherson <br /> (Oak Grove Church Rd) <br /> SS-6207T Portions of Twenty-One(21)Routes. Curve Warning Sign 4/1/24 9/30/24 $200,000 Project approved by BOT and assigned. Dawn McPherson <br /> 51112 Installation. <br /> BP7-R009 Replace Bridge#11 on SR 1336(Halls Mill Road) 11/6/25 FY2027 $1,100,000 Planning and design activities underway Vacant <br /> BP7.R009.1 Plans @ 65% <br /> BP7.R009.2 <br /> BP7.R009.3 <br /> BP7-R017 Replace Bridge#14 on SR 1548(Schley Road) 11/5/26 FY2028 $800,000 Planning and design activities underway Vacant <br /> BP7.R017.1 Plans @ 65% <br /> BP7.R017.2 <br /> BP7.R017.3 <br /> 1-5958 Pavement rehabilitation on 1-40/1-85 from west of SR 1114 11/17/26 FY 2028 $8,690,000 Planning activities pending Chris Smitherman <br /> 45910.1.1 (Buckhorn Road)to west of SR 1006(Orange Grove Road). <br /> 45910.3.1 <br /> R-5821A Construct operational improvements including 6/17/31 FY2033 $3,194,000 PE funding approved 10/10/17,design Chris Smitherman <br /> 47093.1.2 Bicycle/Pedestrian accommodations on NC 54 from SR 1006 activities currently suspended, Coordinating <br /> 47093.2.2 (Orange Grove Road)to SR 1107/SR 1937(Old Fayetteville with NC54 West Corridor Study <br /> 47093.3.2 Road). <br /> TARPO-Orange Cc Dec 2023 <br /> Page 1 <br />