Orange County NC Website
NCDOT DIV 7 PROJECTS LOCATED /N DCHCMPO - UNDER DEVELOPMENT <br /> TIP/WBS# Description LET/Start Completion Cost Status Project Lead <br /> Date Date <br /> SS-6207T Portions of Twenty-One(21)Routes. Curve Warning Sign 4/1/24 9/30/24 $200,000 Project approved by BOT and assigned. Dawn McPherson <br /> 51112 Installation. Planning and design activities underway. <br /> C-5650 Construct sidewalk on one side of SR 1919(Smith Level 12/4/2025 FY2028 $1,718,000 Carrboro approved to incorporate water Town of <br /> Road/S. Greensboro St.)from Public Works Drive to the line work into design. Environmental Carrboro/Stephen <br /> northern end of Old Pittsboro Road in Carrboro document returned with comments on Robinson <br /> 12/10/21. Document to be updated to <br /> include additional limits for resurfacing. <br /> NCDOT waiting on revised plans to be <br /> submitted for review. <br /> HS-2007J Install a new crosswalk with Rapid Rectangular Flashing 11/21/2024 6/30/2025 $300,000 Planning and deisgn activities underway Dawn McPherson <br /> Beacons (RRFB), raised center island, pedestrian signage, <br /> and approximately 125 linear feet of sidewalk on NC 86 at <br /> Critz Drive in Chapel Hill <br /> B-6037 Replace Bridge#49 over Norfolk Southern Railway on NC 1/21/2025 FY2028 $2,500,000 Planning and design activities underway Chris Smitherman <br /> 86 <br /> BR-0092 Replace Bridge#37 on NC 86 over New Hope Creek 8/19/2025 IFY2028 $4,100,000 Planning and design activities underway Alexander Foster <br /> EB-5880 Construct sidewalk on the north side of SR 1005(Jones 9/30/2027 FY2029 $441,000 Municipal agreement needs to be Town of <br /> Ferry Road)from Davie Road to SR 1010(West Main St.)in requested and executed to begin work. Carrboro/Stephen <br /> Carrboro Robinson <br /> EB-5890 Construct sidewalk on Barnes Street from King Street to SR 9/30/2027 FY2029 $230,000 Municipal agreement needs to be Town of <br /> 1005 (Jones Ferry Road)in Carrboro requested and executed to begin work. Carrboro/Stephen <br /> Rnhincnn <br /> EB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from 10/2/2025 FY2027 $3,104,000 Municipal agreement executed and Town of Chapel <br /> south of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) project development underway. Hill/Stephen Robinson <br /> in Chapel Hill <br /> 1-3306AC 1-40 at NC 86-Upgrade to superstreet from Northwood 10/21/2025 FY2028 $4,350,000 Planning and design activities underway Radha Attaluri <br /> Drive to Ramp C/D at 1-40 interchange <br /> DCHCMPO Dec 2023 <br /> Page 2 <br />