Orange County NC Website
91 <br /> Fire and Life Date: Staff: <br /> Safety <br /> 1. No comments <br /> NCDOT Date: Staff: <br /> 1. No comments <br /> Ashley Moncado <br /> Planning Date: 10/16/2023 Staff: amoncado(cDorangecountync.gov <br /> 919-245-2589 <br /> 1. Proposed outdoor storage shall be located a minimum of 100 feet from the parcel lines <br /> and meet all standards contained in Section 6.4.10. <br /> 2. Any proposed outdoor lighting shall comply with Section 6.11. Based on Section 6.11.5, <br /> a lighting plan shall be submitted for review. <br /> 3. Provide documentation from Crown Castle and Orange County DEAPR (owner of <br /> adjacent lot) indicating no objections to utilizing the existing access easement and drive <br /> for the proposed use. <br /> 4. Remove parking calculations referencing one space per employee on the shift of max <br /> employment. <br /> 5. Based on staff review, it appears there are 61 parking spaces (including 2 handicap <br /> parking spaces) identified on the site plan, however, the site plan references 62 parking <br /> space. Please review and confirm the total number of provided parking spaces on the <br /> site plan. <br /> 6. Please note, the revised site plan materials submitted on October 6 did not include an <br /> Existing Conditions page. This may have been left out since it did not require revisions. If <br /> the applicant is no longer including that page in the site plan packet, please incorporate <br /> Solid Waste noted on the Concept Site Plan page. <br /> 7. Based on preliminary comments from the Orange County Agricultural Preservation <br /> Board, staff recommends the narrative and description to be revised to identify and <br /> highlight if materials resulting from this use are utilized for agricultural purposes (i.e. <br /> composting, ground cover, etc.). <br /> 8. A Neighborhood Information Meeting (NIM) is required for the rezoning application <br /> based on Section 2.9.1(D) of the Unified Development Ordinance. Please refer to the <br /> August 15 email from Taylor Perschau, Current Planning & Zoning Supervisor, for <br /> additional information related to the NIM process. <br /> 9. Please see site plan for additional comments. <br /> Solid Waste Date: Staff: <br /> 1. No comments <br /> Stormwater Date: Staff: <br /> Management <br /> 1. No comments <br /> Transportation Date: Staff: <br /> Services <br /> 1. No comments <br />