Browse
Search
Agenda 03-19-24; 5-a - Zoning Atlas Amendment – 6915-UT Millhouse Road, Chapel Hill
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 03-19-2024 Business Meeting
>
Agenda 03-19-24; 5-a - Zoning Atlas Amendment – 6915-UT Millhouse Road, Chapel Hill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 11:23:10 AM
Creation date
3/14/2024 11:30:02 AM
Metadata
Fields
Template:
BOCC
Date
3/19/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for March 19, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 03-19-2024 Business Meeting
Minutes 03-19-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
ORD-2024-006-An Ordinance amending the Orange County zoning atlas
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
OTHER-2024-015-Statement of Consistency
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-003-World Water Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-014-Resolution Retiring Canne Callie and Transferring Her to K9 Handler LT David Funk
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-015-Resolution to Allow for a 25-foot Right of Way for the Type B Private Road Roy Cooper Lane
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-016-Resolution Authorizing the Lease of Dickson House to the Alliance for Historic Hillsborough
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
69 <br /> Proposed Access and Transportation Network Improvements <br /> The Project is proposing access via the existing access easement to Millhouse Road. Based on the <br /> application and total number of trips to be generated, a TIA was not required per Section 6.18.2 of the <br /> UDO. <br /> A Grant of Easement and Assignment of Lease for the existing access easement within the property was <br /> recorded in 2008 between the property owner at that time and Crown Castle. Attachment 5 includes a <br /> letter detailing the applicant's legal right to the access easement, which cannot be confirmed by staff at this <br /> time. Crown Castle has not provided comment on this application despite requests from both the applicant <br /> and County Planning staff. However, the county conducted deed and title research on this property in <br /> 2008, when it was a potential purchaser of the property. The county determined that Crown Castle retains <br /> a perpetual easement on the property for access to their tower that grants them explicit rights to construct <br /> and maintain their tower and first rights of refusal if all or a portion of the easement area is sold. <br /> The existing offsite access easement is located on property owned by Orange County. Due to the <br /> aforementioned access concerns, and in response to the proposed use of the existing easement as a <br /> commercial driveway to serve the applicant's use, the County, specifically the Department of Environment, <br /> Agriculture, Parks & Recreation (DEAPR), requested a condition of future access road construction <br /> through its property from the applicant. The negotiations yielded Conditions 5 and 6 associated with this <br /> zoning application. These conditions, effectively, allow for the continued use of the existing access drive, <br /> which must be improved to County standards, until Orange County develops its property for recreation <br /> purposes. When the county develops this property and constructs a new, norther access road, The Treeist <br /> shall have ten (10) days to begin using this new access, and with the consent of the on-site easement <br /> user, Crown Castle, who has first right of refusal for the shared use of the access easement on the subject <br /> property. <br /> Summary of Transportation Information <br /> Existing Roadway Characteristics <br /> Affected Roadway Millhouse Road <br /> Type of Roadway Local — 2 lane undivided <br /> Current Roadway Capacity 10,000 <br /> Latest Traffic Volume Estimated 2,500 <br /> Traffic Generation <br /> Number of Trips Expected to be Generated by 308 Total Daily <br /> Proposed Project 107 Total AM Peak <br /> 107 Total PM Peak <br /> Proposed Utilities <br /> Water and wastewater services will be provided via a private well and septic system that meet Orange <br /> County Environmental Health standards. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.