Browse
Search
Agenda - 11-02-2005-5d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 11-02-2005
>
Agenda - 11-02-2005-5d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:36:19 AM
Creation date
8/29/2008 10:39:50 AM
Metadata
Fields
Template:
BOCC
Date
11/2/2005
Document Type
Agenda
Agenda Item
5d
Document Relationships
Minutes - 20051102
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~a <br />Grantee's Cable System is a 750 MHz hybrid fiber coaxial, two way capable system. <br />Grantee shall install and maintain the Cable System in accordance with industry <br />standards and shall upgrade the Cable System to meet its business ol?jectives, <br />Section 4. Service Area <br />The Grantee's Service Area shall consist of the unincorporated areas located within the <br />County as may be amended from time to time as the result of amiexation of territory by <br />incorporated municipalities located within the County. <br />Section 5. Cable System Service Area );xtension <br />A The Grantee shall extend service within the County to any household where the <br />number of occupied homes, and homes for which certificates of occupancy have <br />been issued equals at least eighteen (18) homes per mile with the measurement <br />starting from the closest usable active point on the Cable System. The Grantee <br />shall apply for all necessary permits within ninety (90) days of confrmation that <br />the required density is met. Such extensions shall be completed within six (6) <br />months of notification and receipt of all necessary utility permits and other right <br />of way permits. The Grantor may apprrove additional time suUject to a written <br />request by the Grantee that delineates the case for additional time. <br />B. If the number of households per mile is less than eighteen (18), the requesting <br />Customers(s) may obtain service by paying a share of the incremental cost of the <br />extension as follows: <br />The Grantee shall pay a share of costs calculated as the fraction derived <br />from the existing density as calculated above divided by eighteen (18) <br />homes per mile; requesting Customer(s)' share shall equal the r°emainder, <br />For example, if the line extension density is nine (9) homes per mile, the <br />Grantee shall pay fifty percent (50%) of the extension cost and the <br />requesting Customer(s) shall pay the remaining fifty percent (50%). <br />C. Upon receipt of a written request for a Cable Service extension from the Grantor, <br />the Grantee shall, within thirty (30) days, respond in writing with its calculation <br />of the density- If the density is less than eighteen (18) homes per mile, the <br />Grantee shall also provide a f rm price good for ninety (90) days reflecting the <br />proportional share which requesting resident(s) must pay on a cost sharing basis <br />to obtain Cable Service, Wiflrin ninety (90) days from payment of the cost share <br />by prospective Customer(s) and receipt of all necessary utility permits or other <br />Right-of--Way permits, the Grantee shall complete the extension of Cable Service. <br />D. As the household density increases in an area where service is extended on a cost <br />sharing basis, the Grantee shall, upon request, annually refiutd a proportionate <br />share of the Customer(s)' contributions commensurate with the increase in <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.