Orange County NC Website
22 <br /> Impact of proposed water and sewer boundary expansion in Southern Orange County on OWASA Water <br /> Distribution and Wastewater Collection Systems <br /> November 9, 2023 <br /> Page 6 <br /> As described in the Cost Policies for Growth section above, the extension of sewer main to the existing <br /> system would be completed by the benefitting party (developer). The other projects would be included <br /> within OWASA's Capital Improvements Program and would need to be completed sometime before <br /> ultimate buildout occurs. Should the proposed expansion of the water and sewer boundary become a <br /> reality, we expect that the timing, cost, and scope of projects would be further clarified through our <br /> periodic master planning efforts for the distribution and collection systems. <br /> Sincerely, <br /> Ik Vishnu Ga ga haran, P.E. <br /> Director of Engineering and Planning <br /> Copy: Todd Taylor <br /> Ruth Rouse <br /> Coleman Olinger <br /> Jessica Godreau <br />