Orange County NC Website
21 <br /> Impact of proposed water and sewer boundary expansion in Southern Orange County on OWASA Water <br /> Distribution and Wastewater Collection Systems <br /> November 9, 2023 <br /> Page 5 <br /> connects their property to OWASA utilities. The purpose of these fees is to recover a portion of <br /> OWASA's Primary Capital Facilities necessary for providing water, sewer, and/or reclaimed water and, in <br /> effect,to "buy in"to the utility system. <br /> The benefitting party pays for main extensions as needed to bring water, sewer, or reclaimed water to <br /> and throughout their property. The extension of service may consist of constructing water, sewer, <br /> and/or reclaimed water mains, service lines, pump stations, and other appurtenances necessary to serve <br /> a property. In addition, to support future orderly development, they are required to provide easement <br /> within their property for main extension to unserved properties. For developed but unserved areas, <br /> residents may request an assessment project, where OWASA manages and builds the desired <br /> infrastructure and recovers all costs needed to serve the benefitting properties through assessment. <br /> When the mains need to be sized larger than required for the property in order to support the needs of <br /> future development, there may be a cost differential, or excess capacity cost, between the size of pipe <br /> required by OWASA and the base size of the pipe required to serve the property. For sewer mains, this <br /> cost is borne by the developer but may be partially or fully recovered through an Excess Capacity Credit <br /> Agreement. With this agreement, OWASA recovers additional 4%of the System Development Fees from <br /> each new customer benefitting from the upsized main and returns them to the developer annually for <br /> ten years. There is therefore no direct cost of the main extension to current customers. For upsizing of <br /> water mains, OWASA pays the excess capacity cost through a betterment agreement with the <br /> developer. Because of the looped and interconnected nature of water mains, there are not distinct <br /> future beneficiaries of the upsized main to whom the cost is attributable: as the entire distribution <br /> system is strengthened,the excess capacity cost is paid by OWASA ratepayers. <br /> System Development Fees ensure that new development pays its share of OWASA's Primary Capital <br /> Facilities, for which OWASA is financially responsible. Those facilities benefit all or large portions of <br /> OWASA's service area and customer base, and include OWASA's lands, buildings, reservoirs, and <br /> treatment facilities; raw water storage and transmission; treated water pumping; ground and elevated <br /> storage tanks; interconnections with Durham, Hillsborough, and Chatham County; "backbone" water, <br /> sewer, and reclaimed water mains (generally those that are 12 inches or larger in diameter); and sewer <br /> pumping stations and force mains collecting flows from multiple interceptors or those deemed <br /> necessary and permanent by past formal action of the OWASA Board. By paying these fees, the <br /> property becomes an equal partner in the existing OWASA infrastructure and holdings, and shares <br /> equally in any excess capacity costs borne by customers. <br /> Summary <br /> The recommended adjustments to the water distribution and wastewater collection systems to serve <br /> the modeled demands under a high density buildout condition are summarized below. <br /> Type Cost Purpose <br /> Water Main Reinforcing Loop (4800 feet) 1.5 to 3 million Restore available fire flow capacity <br /> Sewer Main Extension (7700 feet) 2 to 3 million Extend from existing system <br /> Sewer Interceptor(2300 feet) 3 to 5 million Provide necessary downstream capacity <br />