Browse
Search
Agenda 03-07-24; 6-a - Amendments to the Water and Sewer Management, Planning, and Boundary Agreement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 03-07-2024 Business Meeting
>
Agenda 03-07-24; 6-a - Amendments to the Water and Sewer Management, Planning, and Boundary Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 11:50:20 AM
Creation date
2/29/2024 11:35:57 AM
Metadata
Fields
Template:
BOCC
Date
3/7/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for March 7, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 03-07-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�WASA Orange Water and Sewer Authority 17 <br /> Our community's trusted partner for clean water and environmental protection. <br /> November 9, 2023 <br /> Ms.Judy Johnson, Assistant Planning Director <br /> Town of Chapel Hill <br /> 405 Martin Luther King Jr Blvd. <br /> Chapel Hill, NC 27514 <br /> SUBJECT: Impact of proposed water and sewer boundary expansion in Southern Orange County on <br /> OWASA Water Distribution and Wastewater Collection Systems <br /> Dear Ms.Johnson, <br /> In response to your inquiry, we are providing a summary of a preliminary analysis we conducted to <br /> determine the impacts to the water distribution system and sewer collection system as a result of <br /> potential expansion to the service area. The area of expansion used for analysis is shown below: <br /> �p a at <br /> 4Lai <br /> y� r �� rnY GF idir L+F <br /> .� MY An <br /> n pp <br /> p i1N GH6TWr a4 i 6 <br /> • dl � <br /> GGyy N <br /> 9LfN�E-up � <br /> °po4c�ze5 i r9f'��kµ4yrp �U4 <br /> �K N)" /'MY A'3TJYU7 A DR <br /> QA7^Y_'r 9F lF (J� fir_, <br /> WAlEUSL <br /> T.i "0 �r � '4 Existing Water and <br /> Ci <br /> �f Sewer Boundary <br /> � V <br /> "'NARK lT a <br /> �r '•O <br /> �'� r ° Proposed Banded bound ary Figure 1—Proposed Boundary Expansion for the analysis <br /> Demand Projections <br /> Based on conversations with Town of Chapel Hill planning staff, we conducted the analysis assuming <br /> buildout development densities would align with the "missing middle" housing and would result in three <br /> to six dwelling units per acre; we assumed no non-residential development would occur. We further <br /> 400 Jones Ferry Road,Carrboro,NC 2751E 0 919-968-4421 (D info@owasa.org 0 @OWASA_NC .' www.owasa.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.