Orange County NC Website
●SOW: <br />•Solution including Design, Material, Installation, Project Management, Commissioning, and Testing of a 700/800 <br />MHz DAS to boost local Viper network. <br />Technical Notes/Assumptions/Customer Responsibilities: <br />•The quotation is based on the scope of work and drawings provided. <br />•Prevailing Wage and/or Union Labor is not required for any work. <br />•Asbestos monitoring/abatement is not required nor included in the quotation. No HEPA or Tenting is needed for any <br />work. <br />•Mechanical lift, and/or ladders in excess of 10' are not required. <br />•The facility has built-in ladders/stairs for accessing the roof and pulley/mechanical lift will be provided to place <br />materials on the roof. <br />•The quote assumes the Rooftop Donor antenna will not require stealthing. <br />•Roof penetrations for donor lines and horizontal fire wall penetrations are in place and Freight elevator service will <br />be available to all levels. <br />•All proposed cable paths are accessible via drop ceiling tiles, crawl space, and access panels. <br />•J-hooks will be used to support the coaxial cable above the ceiling. <br />•Riser Space between floors is available. Coring between floors and/or vertical roof penetrations are not required <br />and is excluded from the quotation. <br />•The customer must provide any roof penetration for donor antennas. Any sidewall penetrations will be completed by <br />MCA/MSI. <br />•The design assumes coax and/or fiber will not be installed in conduit and does not include installation of cable tray <br />nor raceway. <br />•Adequate Electrical Service and Grounding are available within 6' of the active equipment locations. <br />•Installation services will be conducted during normal business hours (8 am to 5 pm, Monday through Friday). <br />•Patching and painting not included in quotation- assumes access panels will be available for access to the ceiling. <br />•Any damage after installation caused by other trades will result in a change order. <br />•As-builts and submittal packages including benchmark results will be provided to the owner at the completion of the <br />project. <br />•All indoor coax & fiber installed in plenum space is plenum rated. No coaxial or fiber cable in this quotation is rated <br />for burn survivability nor installed in conduit. For burn survivability and conduit, please request a re-quote. <br />•The Proposed Solution only includes 700/800 MHz channels, additional frequency bands or changes through add/ <br />deletion or P25 Upgrades may require the equipment to be reprogrammed. <br />•Facility Owner is responsible for all cabling & conduit between DAS and Fire Alarm Panel and is excluded from this <br />budgetary quotation. <br />•Fire Alarm interface and programming provided by others and are not included in the quotation. Dry contacts for <br />Public Safety DAS equipment are provided only. <br />QUOTE-2275549Schools BDA Phase 1 <br />Any sales transaction following Motorola's quote is based on and subject to the terms and conditions of the valid and executed written contract between Customer and Motorola (the ""UnderlyingAgreement"") that authorizes Customer to purchase equipment and/or services or license software (collectively ""Products""). If no Underlying Agreement exists between Motorola and Customer, thenMotorola's Standard Terms of Use and Motorola's Standard Terms and Conditions of Sales and Supply shall govern the purchase of the Products. <br /> Motorola Solutions, Inc.: 500 West Monroe, United States - 60661 ~ #: 36-1115800 <br />Page 5 <br />DocuSign Envelope ID: BE948547-DFB5-4563-86D7-3BADC4768A61