Orange County NC Website
Page 2 of 2 <br /> <br />ENGINEERING REVIEW: The frame will be engineered, signed, and sealed by Fire <br />Tower Engineered Timber, whom Timber Frame Warehouse will employ for this service. <br /> <br />SCHEDULE: It is proposed to have a late winter/early spring construction period with <br />targeted date for completion to be May 01, 2023. Project to be fully completed for a <br />dedication on Memorial Day, May 27 <br /> <br /> <br />End of Addendum No 3 <br />DocuSign Envelope ID: 04339B07-646F-42C4-BDC5-E1198E899093