Browse
Search
2024-054-E-AMS-TMA Systems -MobileTMA Go Upgrade
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-054-E-AMS-TMA Systems -MobileTMA Go Upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 9:18:09 AM
Creation date
2/13/2024 9:16:33 AM
Metadata
Fields
Template:
Contract
Date
1/8/2024
Contract Starting Date
1/8/2024
Contract Ending Date
1/29/2024
Contract Document Type
Contract
Amount
$4,194.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enterprise Asset Management System - Request for ProposalPlease input a "1" in the appropriate column to the right of the feature/function/capability statement. Further explanations, or information regarding 3rd party software and/or modification costs should also be provided in the comments column and Project Costs worksheet (Appendix G), if applicable. Each "non-title" row (?.000) should have only one "1". Blank rows will be scored as Not Available.Legend:Stnd - CurrentStandard-Current: Available in current software releaseStnd - Next ReleaseStandard-Next Release: Guaranteed available in next release of softwareReport WriterReport Writer: function through Standard Reports or Ad Hoc Report Writer3rd-Party App3rd Party Application: Please estimate general cost estimates in comments not a quote, unless available due to your resell arrangement.Custom ModCustom Modification: Custom programming by vendor (not meant to be a set-up configuration that is standard process through implementation). Please estimate general costs in comments (not a quote).Not AvailableNot available in current or next release; interfaced/integrated third-party application or through custom modification.ApplicationFeature NumberFeature / Function / CapabilityStnd - CurrentStnd-NextReport Writer3rd-Party AppCustom ModNot AvailableCommentsAMS - FIELD TECHAMS - FIELD TECHAMS - FIELD TECH 3.000WORK ORDERAMS - FIELD TECH3.001WORK ORDER - Ability for AMS Field Tech to do the following, at a minimum, to update the work orders:1AMS - FIELD TECH3.002ACCESS - Ability to access the work orders assigned to them.1AMS - FIELD TECH3.003ACCESS - Field Tech Supervisor role - Ability to access all the work orders, assinged or unassigned.1AMS - FIELD TECH3.004UPDATE - Ability to update work order status to predefined statuses. 1AMS - FIELD TECH3.005UPDATE - Ability to update the comments on the work performed on a work order.1AMS - FIELD TECH3.006UPDATE - Ability to update the time spent working on a work order.1AMS - FIELD TECH3.007UPDATE - Field Tech Supervisor role - assign or reassign a field tech to a work order.1AMS - FIELD TECH3.008UPDATE - Field Tech Supervisor role - assign or reassign a priority to an existing work order.1AMS - FIELD TECH3.009UPDATE - Field Tech Supervisor role - update the status of an existing and open work order.1AMS - FIELD TECH3.010UPDATE - Field Tech Supervisor role - modify the time spent by a field tech on work order.1AMS - FIELD TECH3.011TIME TRACKING - DURATIONS - Ability for time tracking to exclude durations hold periods (e.g., citizen reviews, submittal periods, etc.)1A ‐ Feature/Function Specs Addendum A ‐ Completed Page 9 DocuSign Envelope ID: D1041CA6-DBD4-42BE-8B32-7C592BF2BA15DocuSign Envelope ID: 3E613CA5-0A37-4CD3-890F-47CC5E2F38B1
The URL can be used to link to this page
Your browser does not support the video tag.