Browse
Search
2024-054-E-AMS-TMA Systems -MobileTMA Go Upgrade
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-054-E-AMS-TMA Systems -MobileTMA Go Upgrade
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 9:18:09 AM
Creation date
2/13/2024 9:16:33 AM
Metadata
Fields
Template:
Contract
Date
1/8/2024
Contract Starting Date
1/8/2024
Contract Ending Date
1/29/2024
Contract Document Type
Contract
Amount
$4,194.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SOL.NO 2016-027 Confidential and Proprietary 42 <br /> <br />Phases of an Implementation <br />Planning Phase <br />During the Planning Phase, TMA and AMS define the scope of the engagement. This includes: <br /> General project goals <br /> Modules purchased <br /> How to best utilize professional services <br /> Deliverables for both TMA and AMS (at each phase/task) <br /> Anticipated customizations/modifications (reports and processes) <br /> Data conversion plan <br /> Testing plan <br /> Training plan <br /> Customer sign‐off on milestones <br /> Go live plan <br /> Project risk analysis <br /> Staffing roles and authorities for both TMA and AMS (including sign‐off authority on Detail <br />Design, Change Orders, etc.) <br /> Activities NOT included in the scope of the implementation <br /> A general timeline for the project <br /> <br />After delivery of the Scope Definition Document, TMA conducts a review session to ensure the <br />accuracy of the content. At that time, there will be a sign‐off of the critical milestones required for <br />a successful implementation. <br /> <br />Design Phase <br />During the Design Phase, a detailed system design is developed and set into action. All <br />implementation decisions and all processes developed and verified during the Planning Phase are <br />adapted to: <br /> Developing a detailed system design <br /> Physically constructing the system in a test and production environment <br /> Developing user procedures that are the foundation for end‐user training <br /> <br />A successful Design Phase relies on accurate input from the Planning Phase with precise execution <br />in the design of the system. Success in designing the system will ensure that the system and users <br />are ready for deployment – this includes verifying accuracy of configuration, customization <br />(including security), data conversion, system performance, and user knowledge. <br /> <br />Training and System Test Phase <br />Once the system is substantially configured, TMA provides training customized to AMS’s work flow <br />and utilizing AMS’s data. These are very effective training sessions that provide personnel with the <br />basic knowledge to utilize the solution. <br /> <br />In addition, TMA will assist in planning, facilitating, and documenting the results of user acceptance <br />in the test environment. These testing sessions are designed to demonstrate the software solution <br />for all known requirements. After a successful completion of these tests the project manager would <br />DocuSign Envelope ID: D1041CA6-DBD4-42BE-8B32-7C592BF2BA15DocuSign Envelope ID: 3E613CA5-0A37-4CD3-890F-47CC5E2F38B1
The URL can be used to link to this page
Your browser does not support the video tag.