Browse
Search
2024-052-E-Solid Waste-Incline Construction Incorporated-Install Restroom Partitions
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-052-E-Solid Waste-Incline Construction Incorporated-Install Restroom Partitions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 9:14:20 AM
Creation date
2/13/2024 9:14:00 AM
Metadata
Fields
Template:
Contract
Date
1/25/2024
Contract Starting Date
1/25/2024
Contract Ending Date
1/29/2024
Contract Document Type
Contract
Amount
$15,600.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />10/18/23 Rev. 12/06/23 <br /> <br />Mr. J Raper <br />Orange County Solid Waste <br />1207 Eubanks Road <br />Chapel Hill, NC 27516 <br />Re: Proposal for New Toilet Partitions in Three Toilets <br /> <br />Mr. Raper: <br /> <br />Please consider this our proposal for removal and replacement of existing toilet partitions in three toilets. The toilets are located <br />in the Orange County Solid Waste Office Building, 1207 Eubanks Road; Chapel Hill, NC. <br /> <br />We offer two options. <br /> <br />Option #1: ASI Global partitions matching existing. $15,600.00 [Fifteen thousand six hundred dollars] <br /> <br />Option #2 Also ASI, with color selection attached. $13,880.00 [Thirteen thousand eight hundred eighty dollars] <br /> <br /> <br />General notes: <br /> Both partitions are the same. Finishes are the only difference. <br /> Both partitions are floor mounted with overhead rail. <br /> Integrated privacy, with continuous wall brackets (no cracks). <br /> Panels and doors are 9.5” above the floor. <br /> Headrail top is 84” above the floor. <br /> No repairs of existing finishes in floors or walls have been included. <br /> Proposal assumes proper support blocking exists in walls (…from the old partition installation) <br /> Pricing includes re-using client’s accessories OR installing client-provided replacement accessories (paper holders, rails, <br />etc.) <br /> <br />Alternate Additional: <br />While we will take every precaution not to damage wall finishes, there may be a need to patch and paint certain wall areas. <br />In most if not all cases, the new toilet partitions will cover the areas of attachment for the old partitions. Patching in this case <br />will not be necessary. <br />That being said, for the best outcome, patch and paint should include an entire wall surface, or “corner to corner” as we say. <br />A unit-cost to patch and paint one wall of a toilet room, in a matching finish will cost $225. <br /> <br />If you have questions. Please reach out at your convenience. <br />Thank you for contacting Incline Construction Incorporated. <br /> <br />Sincerely, <br /> Chris Sparks <br />Sec/Treasurer <br />csparks@inclineconstruction.com <br />Cell 919-819-0640 <br /> <br /> <br /> <br />DocuSign Envelope ID: 4CA39642-7EA6-465D-B4BF-C9C28F49D660
The URL can be used to link to this page
Your browser does not support the video tag.