21
<br /> Preston Royster, PE
<br /> Project Engineer 1 111 W Main Street Durham, NC 27701
<br /> t
<br /> Preston is a Project Manager with 16 years experience in project management and design
<br /> for a variety of commercial, civic/institutional, educational, public and municipal, and
<br /> mixed-use developments. His service background includes a full range of engineering
<br /> and planning services, including site layout, sanitary sewer design, traffic control,
<br /> stormwater engineering, roadway design, hydraulic modeling and design of water lines,
<br /> and construction observation on various projects. Preston has extensive experience with
<br /> designing projects in accordance with local and State water and sewer requirements
<br /> as well as working in urban areas, addressing utility conflicts, and coordinating work to
<br /> minimize impacts to adjacent properties.
<br /> Education
<br /> BS, Civil Engineering, 2004, North Carolina State University
<br /> MS, Civil Engineering, 2007, North Carolina State University
<br /> Project Experience
<br /> Carol Woods Site Improvements, Chapel Hill, NC, and 75 apartment units (3 buildings). The purpose of this
<br /> Principal-in-Charge for the modeling and analysis of a project is to provide affordable housing options in the Town
<br /> campus wide water system and evaluation of available flows of Chapel Hill. The Town of Chapel Hill is the landowner
<br /> and pressures to provide adequate water turnover and meet and developer for the development. Improvements on the
<br /> fire flow demands across campus. The analysis identified site include parking lots, sidewalks and ADA accessible
<br /> opportunities to construct new water mains to reinforce the routes, and recreational amenities including greenway trail,
<br /> existing campus water system to meet system demands. basketball court, playground, nature trail, and community
<br /> Construction involved the installation of multiple water garden. In addition, the project involved the coordination of
<br /> mains. off-site road widening work with approved NCDOT plans,
<br /> water line extensions to provide domestic water and meet
<br /> Ronald McDonald House Expansion, Chapel Hill, NC, fire flow demands, sewer main extensions and storm
<br /> Project Engineer for expansion to the existing Chapel drain piping throughout along with detention for peak flow
<br /> Hill Ronald McDonald House. The expansion includes attenuation and water quality treatment to meet Town of
<br /> building, parking, stormwater management, improvement Chapel Hill requirements.
<br /> of pedestrian walkways and bus stops in the surrounding
<br /> right of way, and connection to trails on adjacent properties. Rocky Mount Mill, Rocky Mount, NC, Land planning, site
<br /> Specific responsibilities included design of stormwater design permits, and construction phases for the revitalization
<br /> control measures, storm drain piping design, and extension of a historic Mill site. Work on this project included floodplain
<br /> of water and sewer mains and services, site permitting permitting; grading; paving; stormwater drainage and water
<br /> through the Town of Chapel Hill, and construction drawings. quality treatment; water main replacements, extensions, and
<br /> modeling; sewer main replacements and extensions; and
<br /> Expansion of the existing State Employees Credit parking lot improvements.
<br /> Union's (SECU) Family House, Town of Chapel Hill, NC,
<br /> Project Manager for expansion of parking, landscaping, Kipp Halifax School, Halifax, NC, Site layout and design
<br /> and improvement of pedestrian walkways, paved trails, and for a new elementary and middle school including road
<br /> design of utilities and stormwater control measures. Specific widening; storm drain piping; play fields and athletic
<br /> responsibilities included design of stormwater control facilities; water main extensions and modeling; sewer main
<br /> measures, stom drain piping design, and extension of water extensions; and sewer lift station and off-site force main
<br /> and sewer mains and services, site permitting through the design and permitting.
<br /> Town of Chapel Hill, and construction drawings.
<br /> Morgan Creek Greenway, Chapel Hill, NC, Construction
<br /> Durham County EMS Study and Site Feasibility, plans, bidding, and contract administration for a 1.1-mile
<br /> Durham, NC, Project Manager for evaluation of multiple section of paved I trail for the Town of Chapel Hill. This
<br /> potential sites for the feasibility of the construction of a new trail is part of the Morgan Creek Greenway in the Chapel
<br /> EMS Station for Durham County. This included site analysis Hill trail system and will connect the shopping centers and
<br /> and schematic designs for each site. commercial facilities with the rest of the trail system. Phase
<br /> one utilized ARRA funds and was designed with NCDOT
<br /> Homestead Gardens, Chapel Hill, NC, 122 residential unit oversight.
<br /> mixed development including 29 townhomes, 18 duplexes,
<br /> TTHOMAS Request for Qualifications (RFQ) to Provide Design Services for the Development of the
<br /> s Greene Tract Master Plan I RFQ No:367-005390 I Orange County, NC
<br /> HUTTON
<br />
|