Orange County NC Website
21 <br /> Preston Royster, PE <br /> Project Engineer 1 111 W Main Street Durham, NC 27701 <br /> t <br /> Preston is a Project Manager with 16 years experience in project management and design <br /> for a variety of commercial, civic/institutional, educational, public and municipal, and <br /> mixed-use developments. His service background includes a full range of engineering <br /> and planning services, including site layout, sanitary sewer design, traffic control, <br /> stormwater engineering, roadway design, hydraulic modeling and design of water lines, <br /> and construction observation on various projects. Preston has extensive experience with <br /> designing projects in accordance with local and State water and sewer requirements <br /> as well as working in urban areas, addressing utility conflicts, and coordinating work to <br /> minimize impacts to adjacent properties. <br /> Education <br /> BS, Civil Engineering, 2004, North Carolina State University <br /> MS, Civil Engineering, 2007, North Carolina State University <br /> Project Experience <br /> Carol Woods Site Improvements, Chapel Hill, NC, and 75 apartment units (3 buildings). The purpose of this <br /> Principal-in-Charge for the modeling and analysis of a project is to provide affordable housing options in the Town <br /> campus wide water system and evaluation of available flows of Chapel Hill. The Town of Chapel Hill is the landowner <br /> and pressures to provide adequate water turnover and meet and developer for the development. Improvements on the <br /> fire flow demands across campus. The analysis identified site include parking lots, sidewalks and ADA accessible <br /> opportunities to construct new water mains to reinforce the routes, and recreational amenities including greenway trail, <br /> existing campus water system to meet system demands. basketball court, playground, nature trail, and community <br /> Construction involved the installation of multiple water garden. In addition, the project involved the coordination of <br /> mains. off-site road widening work with approved NCDOT plans, <br /> water line extensions to provide domestic water and meet <br /> Ronald McDonald House Expansion, Chapel Hill, NC, fire flow demands, sewer main extensions and storm <br /> Project Engineer for expansion to the existing Chapel drain piping throughout along with detention for peak flow <br /> Hill Ronald McDonald House. The expansion includes attenuation and water quality treatment to meet Town of <br /> building, parking, stormwater management, improvement Chapel Hill requirements. <br /> of pedestrian walkways and bus stops in the surrounding <br /> right of way, and connection to trails on adjacent properties. Rocky Mount Mill, Rocky Mount, NC, Land planning, site <br /> Specific responsibilities included design of stormwater design permits, and construction phases for the revitalization <br /> control measures, storm drain piping design, and extension of a historic Mill site. Work on this project included floodplain <br /> of water and sewer mains and services, site permitting permitting; grading; paving; stormwater drainage and water <br /> through the Town of Chapel Hill, and construction drawings. quality treatment; water main replacements, extensions, and <br /> modeling; sewer main replacements and extensions; and <br /> Expansion of the existing State Employees Credit parking lot improvements. <br /> Union's (SECU) Family House, Town of Chapel Hill, NC, <br /> Project Manager for expansion of parking, landscaping, Kipp Halifax School, Halifax, NC, Site layout and design <br /> and improvement of pedestrian walkways, paved trails, and for a new elementary and middle school including road <br /> design of utilities and stormwater control measures. Specific widening; storm drain piping; play fields and athletic <br /> responsibilities included design of stormwater control facilities; water main extensions and modeling; sewer main <br /> measures, stom drain piping design, and extension of water extensions; and sewer lift station and off-site force main <br /> and sewer mains and services, site permitting through the design and permitting. <br /> Town of Chapel Hill, and construction drawings. <br /> Morgan Creek Greenway, Chapel Hill, NC, Construction <br /> Durham County EMS Study and Site Feasibility, plans, bidding, and contract administration for a 1.1-mile <br /> Durham, NC, Project Manager for evaluation of multiple section of paved I trail for the Town of Chapel Hill. This <br /> potential sites for the feasibility of the construction of a new trail is part of the Morgan Creek Greenway in the Chapel <br /> EMS Station for Durham County. This included site analysis Hill trail system and will connect the shopping centers and <br /> and schematic designs for each site. commercial facilities with the rest of the trail system. Phase <br /> one utilized ARRA funds and was designed with NCDOT <br /> Homestead Gardens, Chapel Hill, NC, 122 residential unit oversight. <br /> mixed development including 29 townhomes, 18 duplexes, <br /> TTHOMAS Request for Qualifications (RFQ) to Provide Design Services for the Development of the <br /> s Greene Tract Master Plan I RFQ No:367-005390 I Orange County, NC <br /> HUTTON <br />