Browse
Search
Agenda 02-06-24; 8-e - Orange County FY 2024 Annual Work Program Amendment #1 - FAST 2 Study Commitment
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 02-06-2024 Business Meeting
>
Agenda 02-06-24; 8-e - Orange County FY 2024 Annual Work Program Amendment #1 - FAST 2 Study Commitment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 1:20:07 PM
Creation date
2/1/2024 1:16:29 PM
Metadata
Fields
Template:
BOCC
Date
2/6/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for February 6, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 02-06-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> DRAFT SCOPE OF SERVICES <br /> As requested by North Carolina Department of Transportation ("Client"),WSP USA Inc. ("Consultant") proposes the <br /> scope of services listed in subsequent sections below and includes professional services for the Freeway, Arterial, <br /> Street,and Tactical (FAST)2.0 Study("Project"). <br /> SCOPE ASSUMPTIONS <br /> The work tasks described in this scope assume the following: <br /> 1. The Client will provide the Consultant with all supporting segment traffic counts,turning movement counts, <br /> bicycle and pedestrian counts,travel demand,transit ridership,travel time data,etc.The availability of data <br /> will be discussed during the initial conference call with the Client Project Manager. <br /> 2. The Client will provide the Consultant with all available plans and studies within and adjacent to the study <br /> area,including but not limited to land use plans,transportation plans,design standards,special studies,and <br /> recent traffic impact analysis studies. <br /> 3. The Client will provide all supporting GIS data files. <br /> 4. The Consultant will not collect any new traffic,environmental,survey or other data for this project. <br /> 5. The Consultant will provide opportunities for meetings with project stakeholders to provide "over the <br /> shoulder review"of interim work products,without having to wait for formal review periods. <br /> 6. Deliverables will be actionable in nature and will primarily include executive summary-style memos with <br /> maps and graphics supported by technical reports. Some materials will be global in nature, and others will <br /> be tailored to individual agencies—municipalities,regional planning agencies,different NCDOT departments <br /> and divisions - and include a specific roadmap for implementation, funding, and further planning/design <br /> projects. The actionable materials should be presented so that they may be modified by the ongoing <br /> implementation group as future conditions change. <br /> 7. The Client will be responsible for the translation of materials and making materials 508-compliant, as <br /> needed. <br /> 8. This scope of work assumes a twelve (12) month Project schedule that will begin upon receipt of a signed <br /> contract or Notice to Proceed letter. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.