Browse
Search
Agenda - 06-18-2002 - 9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 06-18-2002
>
Agenda - 06-18-2002 - 9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2017 2:32:00 PM
Creation date
8/29/2008 10:39:39 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20020618
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Dat: June 18,2002 <br /> Action Againve <br /> Item No. <br /> SUBJECT: Bid Award Whiffed Building HVAC Renovation <br /> DEPAR EWT Purchasing and Central Services PUBLIC HEARING: (YAO) No <br /> Public Works Department <br /> ATTACHMENT(S): INFORMATION CONTACT: <br /> Pam Jones(919)24&2552 <br /> March 27,2002 Memorandum to B0OC Wilbert McAdoo(919)24&2525 <br /> CeNfied Bid Tabulation TELEPHONE NUMBERS: <br /> Hiliaborough M4181 <br /> Chapel HIS 9684501 <br /> Derhem 99&]391 <br /> Mebane 9961- klb(91 <br /> PURPOSE: To consider awarding a bid for HVAO system replacement at the Whiffed Building In <br /> Hillsborough, NC. <br /> BACKGROUND: <br /> The existing HVAC system was inclosed!when the building was renovated in the early 1990's. The <br /> system requires significant time and money to keep it maintained to a satisfactory operatng level. <br /> Further,there continues to be air quality concerns throughout the building,which are exacerbated by the <br /> existing system's inability to function properly. <br /> The County conducted a feasibility study to determine the most efficient system for the building. The <br /> resulting system was designed by Reece Noland McEll Bids for the replacement of the system were <br /> received on May 29, 201 with receipt of nine responsive bids. <br /> Bid Result <br /> The bids tatted a very positive Mange in to bidding climate as compared to our experience In the past <br /> several years. The low bid, Including all components of Me project is U,M,874 as submitted by <br /> EnNronmertal Per Systems,Greeensboro, NC. <br /> Scow of work <br /> The bid contains several components: <br /> 1. HVAC system rapacemenp including ductwork <br /> 2. Gelling and Iightlng replacement <br /> 3. Dater wiring throughout Me building <br /> 4. Renovation of the Health Department Clinic <br /> The data wiring in the Whiffed Building is a hodgepodge of wiring Mat has evolved over Me pest several <br /> years. The ceilings will be open throughout the building with the ductwork, ceiling and lighting <br /> replacement,creating an excellent opportunity to properly install Me wiring. This action will significantly <br /> improve the long-term performance of Me existing network service within the Whiffed Building and will <br /> promde a framework for future installations as well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.