Browse
Search
Agenda - 06-18-2002 - 8p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 06-18-2002
>
Agenda - 06-18-2002 - 8p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2017 2:21:25 PM
Creation date
8/29/2008 10:39:37 AM
Metadata
Fields
Template:
BOCC
Date
6/18/2002
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8p
Document Relationships
Minutes - 20020618
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: June 18, 2002 <br /> Action Age%da <br /> Man No. -� <br /> SUBJECT: Bid Award: Whiffed Perking Lot Paving Prolad <br /> DEPARTMENT: Purchasing & Central Services PUBLIC HEARING: (Y/N) No <br /> ATTACHMENT($): INFORMATION CONTACT: <br /> Pam Jones (919)245-2652 <br /> Bid Tabulation <br /> Parking Memorandum to WM1iretl TELEPHONE NUMBERS: <br /> Employees Hillsborough 7324181 <br /> Chapel Hill 9684501 <br /> Durham 6887331 <br /> Mebane 336-227.2031 <br /> PURPOSE: To consider awarding a bid for paving two (2) parking lots at the Whittetl Building, <br /> 300 West Tryon Street, Hillsborough, NC. <br /> BACKGROUND: Sufficient packing at the Whittetl Building continues to be a challenge. The <br /> County has recently taken several steps in an attempt to address parking issues, including <br /> relocating the Orange Public Transportmon buses off-site and designating lots for public and <br /> employee parking (see attached memorandum to employees fmm the Manager). One of the <br /> primary mechanisms to maximize existing parking, however, is to pave the lots. Engineering <br /> estimates indicate that the number of cars parked can be increased by up to 25% on a paved <br /> lot in which the spaces are marked. <br /> Specifications were prepared by MANIA Engineers to pave two (2) lots; one at the corner of <br /> Tryon and Hassell Sheets and the other which lies tc the east of the Whittetl Building with entry <br /> off Tryon Street. Bids were solicited on June 5, 2002,with three responsive bids received. The <br /> bids ranged from $60,500 to$99,823 (see attached tabulation). The engineering estimates for <br /> this work were in the range of$75,000. The low bid as submitted by False Builders for <br /> $60,500 re0ects the current, much improved bid climate and is recommended for award If <br /> approved by the Board,Me work would be carried out in July 2002. <br /> FINANCIAL IMPACT: Funds are currently available in the Whined Human Services Capital <br /> Project to cover Me cost of the parking improvements outlined in the Background section. The <br /> Board approved the appropriation of pay-as-you-go funds to this project in previous fiscal years. <br /> REC0MMENDATI0Ni The Manager recommends that the Board award the bid for paving <br /> two(2) parking lots at the Whited Building to Pa not Builders in an amount of$60,500; and <br /> authorize the Purchasing Director to execute the appropriate paperwork pursuant to the <br /> specifications, drawings as prepared by MANIA Engineering, and the bid response dated June <br /> 5, 2002 as submitted by Patnot Builders. <br />
The URL can be used to link to this page
Your browser does not support the video tag.