Orange County NC Website
DocuSign Envelope ID:569754E1-D2B6-4DBE-B14F-1579C72E692B <br /> E2 Action Plan <br /> In this task, the Consultant will develop an action plan that outlines the steps of data collection,timeline of update, and <br /> identify potential funding sources required to realize the proposed connectivity improvements.This action plan will <br /> highlight coordination efforts between different jurisdictions, potential partnerships with relevant agencies, and strategies <br /> to engage the community in the implementation process.The Consultant will present the draft action plan to the Client <br /> and the CTT and based on their comments, will revise the action plan up to two (2) times. <br /> E3 Final Report and Map Update <br /> The entire endeavor that the Consultant,the Client, and the CTT members undertake throughout this project will <br /> culminate into a final report document at the final leg of this project. As a part of this report,we will deliver a final table of <br /> projects, a map of adopted projects and recommendations made as a part of this study,writeup on project methodology, <br /> and deliverables from each task as appropriate.The Consultant will present the final draft to the Client and CTT and make <br /> the requisite changes (up to two (2)times) based on their comments before finalizing the report. <br /> Our team will update the map and table created in Task B3 and include the additional projects and other changes <br /> identified in the final report. <br /> The shapefile and table created at the end of this project will form the basis for developing an interactive web-based map <br /> as a part of the Orange County Transportation Dashboard.The scope and fee of that project will be developed separately <br /> and will not be a part of this project. <br /> Key Deliverables: <br /> • Prioritization Matrix (1) <br /> • Action Plan (1) <br /> • Final Report(1) <br /> • Updated map and shapefile (1) <br /> • Updated project table (1) <br /> 7 <br />