Orange County NC Website
DocuSign Envelope ID:569754E1-D2B6-4DBE-B14F-1579C72E692B <br /> B3 Consolidated Map and Projects Table <br /> The Consultant will use the shapefile and the attribute table to create a consolidated map and table of projects.The <br /> Consultant will use ArcGIS Pro to create this map and it will be formatted to fit a large plot size (2204 or similar).The map <br /> will have insets for areas with a higher density of projects.The table of projects will be created separately. <br /> The Consultant will present the draft map and table to the CTT and based on their comments, will revise this map.This <br /> scope assumes revision to the map and table up to two (2) times. <br /> Key Deliverables: <br /> • List of plans to be considered for consolidation (1) <br /> • GIS Shapefile including selected projects from all plans (1) <br /> • Master projects table including selected projects from all plans (1) <br /> • Consolidated and formatted map of projects (1) <br /> TASK C: MULTI MODAL ANALYSIS <br /> C1 Transportation Gap Analysis <br /> This task will build upon the maps and data created as a part of Task B. In this task, the Consultant will use the maps from <br /> Task B to identify gaps in the planned system connectivity.The Consultant will assess the existing network and future <br /> project links to identify low hanging fruits in terms of connectivity.The Consultant will focus on transit, rail, freight, <br /> roadways, sidewalks, bike lanes, and multi-use paths for this gap analysis.The Consultant will present these gaps to the <br /> CTT to get their assessment of the potential solutions for the gaps in the network. <br /> C2 Multimodal Improvements <br /> In this task, the Consultant will develop solutions for the gaps identified in task C1.The Consultant will present the <br /> preliminary recommendations to the Client and the CTT, incorporate their inputs and modify the recommendations <br /> accordingly.These recommendations will be presented to the public during the public engagement round and their <br /> comments will be discussed with the CTT and the Client.These steps will culminate in the Consultant developing a final set <br /> of multimodal recommendations to bridge the gaps identified in Task C1. <br /> Key Deliverables: <br /> • Transportation Gap Analysis map (1) <br /> • Draft recommendations to bridge the gaps- Client, CTT and Public review(1) <br /> • Final set of recommendations (table and map) (1) <br /> TASK D: PUBLIC ENGAGEMENT <br /> The key focus of this plan is to consolidate the plans that have already been adopted by the jurisdictions. Since the plans <br /> have already gone through their own rigorous public engagement processes, we expect the Multimodal Plan to require <br /> one (1) round of Public Engagement to occur after the draft multimodal improvements plan as a part of Task C2. <br /> Engagement will focus on introducing the planning process to the public, presenting the draft multimodal improvements <br /> developed in task C2, and collecting feedback on community priorities and goals to set stage for the project prioritization <br /> in Task E. <br /> D1 Task Coordination <br /> Two (2) members of the Public Engagement team will participate in one (1) pre-planning public engagement meetings <br /> with the Client to prepare for public engagement and review the strategy prior to the start of the engagement phase.The <br /> strategy will include a detailed description of the planned engagement activities, outcomes materials, and timeline of <br /> production. <br /> 4 <br />