Browse
Search
Agenda 01-16-24; 8-n - Approval of Motorola Solutions, Inc. Contract for Bi-directional Antenna Systems in K-12 Schools
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 01-16-2024 Business Meeting
>
Agenda 01-16-24; 8-n - Approval of Motorola Solutions, Inc. Contract for Bi-directional Antenna Systems in K-12 Schools
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 12:52:10 PM
Creation date
1/11/2024 1:47:53 PM
Metadata
Fields
Template:
BOCC
Date
1/16/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for January 16, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 01-16-2024 Business Meeting
Minutes 01-16-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-003-Service Contract with CRTS, Inc.
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-005 Service Contract with Motorola Solutions, Inc
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> Orange County, NC December 6,2023 <br /> Emergency Radio Respose Converage <br /> 2.2 Orange County, NC Responsibilities <br /> Orange County will assume responsibility for the installation and performance of all other equipment <br /> and work necessary for completion of this project that is not provided by Motorola. General <br /> responsibilities for Orange County include the following: <br /> Assigning a project manager, as one point of contact, to work with Motorola and has the <br /> authority to to make decisions on behalf of Orange County. <br /> Reviewing the preliminary Project Schedule with Motorola's Project Manager and assisting <br /> Motorola Solutions in developing a Project Schedule to define the detailed tasks and timeline <br /> for the completion of Motorola Solutions and Orange County responsibilities. <br /> For Public Safety DAS Solutions, Motorola will demarc all alarm outputs within 3 feet of the <br /> installed BDA and BBU. If needed, Orange County will need to use their preferred electrical <br /> and alarm vendor to connect the alarm to the building fire safety panel. <br /> Orange County is responsible for any costs associated with any required third-party inspection <br /> of wall penetrations. <br /> Orange County is responsible for any costs, materials, and labor if roof penetrations and the <br /> associated conduit are needed/required to complete the installation. <br /> Ensure communications sites meet space, grounding, power, and connectivity requirements for <br /> the installation of all equipment. <br /> Provide floor plans in soft copy (Visio or AutoCAD). <br /> Provide any necessary FCC license modification for the new BDA system.The costs of this is <br /> the responsibility of Orange County. <br /> Provide six pairs of conductors brought to into the BBU. Pairs shall be labeled: Alarm 1, Alarm <br /> 2, Alarm 3, Alarm 4, Alarm 5, Alarm6, etc. <br /> County shall leave (6) resisters with the conductors in order for appropriate alarm system <br /> operation. <br /> Approve locations for all equipment in sites. <br /> Approve cable pathways for all DAS cabling. <br /> Provide applicable permits. <br /> Orange County will provide 120 VAC/15A electrical outlet (dedicated breaker recommended) <br /> for the proposed equipment installation. <br /> Orange County is providing safe, secure onsite storage for the equipment and materials at <br /> each school location. <br /> Coordinate the activities of all Orange County vendors or other contractors. <br /> Orange County shall provide assets tags to MSI at the start of each installation for tagging. <br /> Statement of Work ®MOTOROLA SOLUTIONS <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. <br /> Motorola Solutions <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.