Browse
Search
Agenda 01-16-24; 8-n - Approval of Motorola Solutions, Inc. Contract for Bi-directional Antenna Systems in K-12 Schools
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 01-16-2024 Business Meeting
>
Agenda 01-16-24; 8-n - Approval of Motorola Solutions, Inc. Contract for Bi-directional Antenna Systems in K-12 Schools
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 12:52:10 PM
Creation date
1/11/2024 1:47:53 PM
Metadata
Fields
Template:
BOCC
Date
1/16/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for January 16, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 01-16-2024 Business Meeting
Minutes 01-16-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-003-Service Contract with CRTS, Inc.
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-005 Service Contract with Motorola Solutions, Inc
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> Orange County, NC December 6,2023 <br /> Emergency Radio Respose Converage <br /> Horizontal fire wall penetrations are in place and Freight elevator service will be available to all <br /> levels. <br /> Adequate Electrical Service and Grounding are available within 6' of the active equipment <br /> locations. <br /> J-hooks will be used to support the coaxial cable above the ceiling. <br /> Riser Space between floors is available. Coring between floors and/or vertical roof <br /> penetrations are not required and is excluded from the quotation. <br /> All proposed cable paths are accessible and can be reached with an 8-foot ladder. <br /> Asbestos monitoring/abatement is not required nor included in the quotation. No HEPA or <br /> Tenting is needed for any work. <br /> Access panels to allow access to areas inside hard, finished ceilings will be provided / <br /> installed by others if necessary. <br /> Patching and painting not included in quotation- assumes access panels will be available for <br /> access to the ceiling. <br /> Scaffolding, bucket trucks and/or lifts are not required for delivery of this project. <br /> Adequate off-air, RF signal exists for Public Safety frequencies. <br /> Any damage after installation caused by others will result in a change order. <br /> All indoor coax &fiber installed in plenum space is plenum rated. No coaxial or fiber cable in <br /> this quotation is rated for burn survivability nor installed in conduit. For burn survivability and <br /> conduit, please request a re-quote. <br /> The Proposed Solution only includes 700/800 MHz channels, additional frequency bands or <br /> changes through add/deletion or P25 Upgrades may require the equipment to be <br /> reprogrammed. <br /> Phasing is not included in the quotation. This quote assumes work will be completed in 1 <br /> deployment. Any additional phasing requirements/trips will result in a change order. Any <br /> canceled PO's are subject to an equipment restocking fee and any unreturnable equipment <br /> due to canceled PO will be invoiced at full cost. <br /> Facility Owner is responsible for all cabling & conduit between DAS and Fire Alarm Panel and <br /> is excluded from this quotation. <br /> Fire Alarm interface and programming provided by others and are not included in the <br /> quotation. Dry contacts for Public Safety DAS equipment are provided only. <br /> Orange County is responsible to have Fire Alarm Control Panel Relay delivered to within 3' of <br /> the PS Repeater and BBU. <br /> 2.4 Change Order Process <br /> Either Party may request changes within the general scope of this Agreement. If a <br /> requested change causes an increase or decrease in the cost, change in system <br /> configuration or adds time to the project's timeline required to perform this Agreement, <br /> the Parties will agree 3to an equitable adjustment of the Contract Price, Performance <br /> Schedule, or both, and will reflect the adjustment in a change order. Neither Party is <br /> obligated to perform requested changes unless both Parties execute a written change <br /> order. <br /> Statement of Work MOTOliOLA SOLUTIONS <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. <br /> Motorola Solutions <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.