Browse
Search
Agenda 01-16-24; 8-n - Approval of Motorola Solutions, Inc. Contract for Bi-directional Antenna Systems in K-12 Schools
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 01-16-2024 Business Meeting
>
Agenda 01-16-24; 8-n - Approval of Motorola Solutions, Inc. Contract for Bi-directional Antenna Systems in K-12 Schools
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 12:52:10 PM
Creation date
1/11/2024 1:47:53 PM
Metadata
Fields
Template:
BOCC
Date
1/16/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for January 16, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 01-16-2024 Business Meeting
Minutes 01-16-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
OTHER-2024-003-Service Contract with CRTS, Inc.
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-005 Service Contract with Motorola Solutions, Inc
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> Orange County, NC December 6,2023 <br /> Emergency Radio Respose Converage <br /> 2.3 Assumptions <br /> Motorola has made several assumptions in preparing this proposal, which are noted below. In order to <br /> provide a firm quote, Motorola will need to verify all assumptions or seek alternate solutions in the case <br /> of invalid assumptions. <br /> This proposal is based upon the scope of work above and the floor plans provided by Orange <br /> County. If any changes in scope are needed, the costs will be provided to Orange County via a <br /> change order. <br /> All existing sites or equipment locations will have sufficient space available for the system <br /> described as required. <br /> All existing sites or equipment locations will have adequate electrical power in the proper phase <br /> and voltage, and site grounding to support the requirements of the system described. <br /> Any site/location upgrades or modifications are the responsibility of Orange County. <br /> Approved FCC licensing provided by Orange County. <br /> Approved local, State, or Federal permits as may be required for the installation and operation <br /> of the proposed equipment are the responsibility of Orange County. <br /> Any required system interconnections not specifically outlined here will be provided by Orange <br /> County. These may include dedicated phone circuits, microwave links, or other types of <br /> connectivity. <br /> All work is assumed to be conducted 8AM to 5PM. <br /> Sites do not have any hazardous materials present. Removal of hazardous materials is the <br /> responsibility of Orange County <br /> Motorola is not responsible for interference caused or received by the Motorola-provided <br /> equipment except for interference that is directly caused by the Motorola-provided <br /> transmitter(s) to the Motorola-provided receiver(s). Should Orange County's system <br /> experience interference, Motorola can be contracted to investigate the source and <br /> recommend solutions to mitigate the issue. <br /> Provide building access to Motorola Solutions personnel to all facilities where the system is to <br /> be installed during the project. Temporary identification cards should be issued to Motorola <br /> Solutions personnel if required for access to the Orange County facilities. Orange County will <br /> ensure that Motorola Solutions has unrestricted site access for timely access and to prevent <br /> delays. Each site will require access multiple times during the course of the project. Access <br /> must be provided in accordance with the project schedule. Access must be available after <br /> business hours where required by Motorola, or as necessary to meet the project schedule. <br /> Relocation of power or utilities is not included in this proposal and would be the responsibility <br /> of Orange County if needed. <br /> Orange County will provide any required parking permits to Motorola personnel for restricted <br /> access entry or parking. If no permits are required, Orange County will ensure onsite parking <br /> is available during the installation. <br /> There is no prevailing wage requirements, MBE, or performance bond, or similar requirements <br /> for this project. <br /> No safety training is required beyond the standard OSHA- complaint training. <br /> Orange County must provide any roof penetration for donor antennas. Any sidewall <br /> penetrations will be completed by Motorola <br /> The facility has built-in ladders/stairs for accessing the roof and pulley/mechanical lift will be <br /> provided to place materials on the roof. <br /> Rooftop Donor antenna will not require stealthing. <br /> Statement of Work MOTOROLA SOLUTIONS <br /> Use or disclosure of this proposal is subject to the restrictions on the cover page. <br /> Motorola Solutions <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.