Orange County NC Website
2 <br /> 1 The following Phase 2 work has commenced, with some parts completed prior to this November <br /> 2 9, 2023 Board work session: <br /> 3 Developing a Current Policy Profile <br /> 4 Preparation of the Equity Database for engagement publicity <br /> 5 Preparing for Community Engagement Window#1 (CEW#1) <br /> 6 Holding the first public workshop launching CEW#1 <br /> 7 <br /> 8 Highlights From First Public Workshop <br /> 9 The first public outreach window was launched through an in-person workshop on October 26, <br /> 10 2023 from 6:00-8:00 pm at the Bonnie B. Davis Environmental and Agricultural Center. <br /> 11 Asynchronous online engagement activities follow for a minimum period of three weeks. This will <br /> 12 allow participants to engage in a way that works best with their lifestyle and schedule, while also <br /> 13 allowing them the opportunity to provide feedback in a similar way as the participants of the in- <br /> 14 person workshop. Clarion Associates will provide highlights from the October 26, 2023 workshop <br /> 15 as part of the November 9, 2023 work session. <br /> 16 <br /> 17 Additional information is provided in Attachment A. A PowerPoint presentation will be provided at <br /> 18 the meeting. <br /> 19 <br /> 20 Tom Altieri, Senior Planner, introduced the item and the presenter Leigh Anne King, of <br /> 21 Clarion Associates. <br /> 22 Leigh Anne King made the following the presentation: <br /> 23 <br /> 24 Slide #1 <br /> y �jf <br /> Novernbe 2023 <br /> C ORANGE COUNTY <br /> LAND <br /> r ■ <br /> Board / County <br /> Guiding• * <br /> Commissioners <br /> Briefing <br /> 25 CLARION <br /> 26 <br /> 27 <br />