Orange County NC Website
19 <br /> 1 Vice-Chair McKee asked if repair would be allowed but tearing it down would not because <br /> 2 of the stream location. <br /> 3 Jay Smith said the building is grandfathered and located along the stream so that is <br /> 4 correct. <br /> 5 Vice-Chair McKee asked at what point is removing Link's roof and facade a tear-down <br /> 6 versus a renovation. <br /> 7 Jay Smith said that if they can keep the structure of the building intact, they can rebuild <br /> 8 the fagade and correct the water intrusion problems. He said that Link could solve a lot of the <br /> 9 space needs in the county, especially for the Justice Center. <br /> 10 <br /> 1 1 Slide #7 <br /> Key Decision #2 <br /> OLD JAIL FACILITY & SITE <br /> ' Public oPrenee= <br /> Status—Vacant,Property sire is 1.52 acers&includes Court St.Annex <br /> _ <br /> Options y' 5•,W.-. <br /> 1. De-construct,build parking lot for Justice Center needs.Preserve , r <br /> lana for long range growth/needs ! <br /> 2. if fink Bldg.is not renovated....De-construct old Jail,build auw,•„ <br /> 26,000 GSF Justice Center Annex to meet Justice Department 4„�,„_ <br /> growth needs cu,+nay, '�+ <br /> Cost <br /> 1.De-construct Jail,build new parking lot:Approx.$1,500,000 <br /> o sanc, <br /> 2.26,000 SF Justice Annex:Approx.$15,600,000 ($605/SF) L Ju"it"reMa naa,rr <br /> I <br /> 3 <br /> Recommendation <br /> • De-construct old Jail—Build a parking lot and open space <br /> • Preserve space for future Justice Center growth/needs s rA�a <br /> 12 • Site can support 26,000 GSF facility <br /> Nrve,P.,k <br /> 13 Jay Smith said that solving this area could help solve the parking problem. <br /> 14 <br /> 15 Slide #8 <br /> Key Decision #3 <br /> EMERGENCY MANAGMENT BLDG L� <br /> StcltWs—Facility does not meet industry standards for safety&security. 'r J �j Lie <br /> Current Emergency Management Building(EMS)is 22,069 SF(deficient + ,, <br /> by 10,000 SF).44,000 SF needed by 2040.Site is not suitable to expand E <br /> on and meet necessary security requirements and upgrades. ',,! $' 'y <br /> Options t <br /> 1. Build a modern EMS at the Motor Pool Site,backfill with AM5& <br /> storage or other Co.function(s)or sell the property as surplus A <br /> 2. Build an annex near the existing facility ' , <br /> Cost •- <br /> Option 1.New EMS,Approx.$28,000,000($636/SF) t y <br /> Option 2:Build Annex,Approx.$10,400,000 <br /> Recommendation <br /> • Build new EMS facility at Motor Pool site—use ex building for <br /> AMS&general storage and flex/swing space ,' ` <br /> 16 -' <br />