Browse
Search
Agenda 01-16-24; 8-k - Contract Award to CRTS, Inc. for Design and Build of Two (2) Custom 48-Foot Tipper Trailers
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 01-16-2024 Business Meeting
>
Agenda 01-16-24; 8-k - Contract Award to CRTS, Inc. for Design and Build of Two (2) Custom 48-Foot Tipper Trailers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 12:51:44 PM
Creation date
1/11/2024 12:43:15 PM
Metadata
Fields
Template:
BOCC
Date
1/16/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-k
Document Relationships
Agenda for January 16, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 01-16-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> Doe to potential material cost increases. delivered unit 12ricing will be finalized 90 daysprior to <br /> start of 12roduction. <br /> UNIT PRICE $63,078.00 <br /> Quote # 86675 FET 50.00 <br /> 1®b # Sales Tax 50.00 <br /> SUB TOTAL $63,078.00 <br /> Freight $1.800.00 <br /> $64,878.00 <br /> Trade In Allowance $0.00 <br /> Down Payment $0.00 <br /> Pricing is in U.S. Currency BALANCE IJJE $s4,s7s.0o <br /> x (2) units <br /> Total Price: $129,756.00 <br /> Ttj,4r-4 you for your bus.i.rta_gss <br /> ORDER CANCELLATION POLICY <br /> Orders configured with common published and non-published options will not be subiect to a cancellation penalty when the Manufacturer receives the request <br /> for cancellation 12 or more weeks prior to the scheduled production date.All cancellation requests received within 12 weeks but no less than 8 weeks of the <br /> scheduled production start date must be approved by the Product Manager for the specified product line and will be subiect to a$2500.00 cancellation fee. <br /> Cancellation requests within 8 weeks of the scheduled production start date will not be accepted <br /> ***denotes a weight for reference only.Trailer weight will be provided with the engineering design approval packet. <br /> 9/6/23 8:51 am Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.