Orange County NC Website
57 <br /> Compp forward.ns . . <br /> etermine the <br /> best ath <br /> 04 OCS OPTIONS <br /> OPTION A - COMFORTABLE OPTION B - COMFORTABLE AND SAFE, <br /> AND SAFE PLUS 10-YEAR FACILITY NEEDS <br /> 5-YEAR INVESTMENT: $80.1M @ $16.OM/YEAR 10-YEAR INVESTMENT: $421.7M @ $42.2M/YEAR <br /> WOption A provides for high priority repairs and Option B addresses all building needs identified <br /> system replacements that address building sys W in the facility condition assessment. This option <br /> oc brings the facility conditions to a like new state. <br /> LU tems that keep students and occupants warm, <br /> c cool,safe,and dry. o However; there is no change to the educational <br /> spaces or adequacy of the schools. <br /> Lu Option A addresses only near term facility Z Option B addresses anticipated facility needs of <br /> Wrequirements. This option should be executed J the next ten years.This option should be executed <br /> over the next 5 years, which is approximately u.i over the next 10ears which is approximately <br /> F— $16 million per year. 10y <br /> pp y <br /> � $42.2 million per year. <br /> p Smallest investment option y <br /> CL. • Addresses 20 percent of facility needs a Addresses all facility needs <br /> • No change to educational environment • No change to educational environment <br /> Z • No adjustments to capacity z No adjustments to capacity <br /> c • No new or renovated schools No new or renovated schools <br /> C-2 <br /> • Many facility needs not addressed • Largest investment option <br /> OCS OPTIONS SUMMARY <br /> OPTION INVESTMENT TIMELINE COST/YEAR <br /> OPTION A $80.1 M 5 YEARS $16.0 M <br /> OPTION B $421.7 M 10 YEARS $42.2 M <br /> OPTION C $216.0 M 10 YEARS $21.6 M <br /> OPTION 0 $463.9 M 15 YEARS $30.9 M <br /> 15 <br />