Browse
Search
Agenda 01-16-24; 7-b - Discussion on School and County Capital Planning and Financing Scenarios
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 01-16-2024 Business Meeting
>
Agenda 01-16-24; 7-b - Discussion on School and County Capital Planning and Financing Scenarios
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 12:47:25 PM
Creation date
1/11/2024 12:36:31 PM
Metadata
Fields
Template:
BOCC
Date
1/16/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for January 16, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 01-16-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53 <br /> Comparing options to determine the best path <br /> forward . <br /> 03CHCCS OPTIONS _j <br /> ANNEENESEL— -Aid <br /> OPTION A - COMFORTABLE AND OPTION B - COMFORTABLE AND SAFE, <br /> SAFE PLUS 10-YEAR FACILITY NEEDS <br /> 5-YEAR INVESTMENT: $139.7M @ $27.9M/YEAR 10-YEAR INVESTMENT: $675.1M @ $67.5M/YEAR <br /> W Option A provides for high priority repairs Option B addresses all building needs identified <br /> and system replacements that address build- W in the facility condition assessment. This option <br /> W ing systems that keep students and occupants brings the facility conditions to a like new state. <br /> c warm,cool,safe,and dry. However; there is no change to the educational <br /> C= spaces or adequacy of the schools. <br /> z Option A addresses only near term facility z Option B addresses anticipated facility needs of <br /> Wrequirements.This option should be executed J the next ten years.This option should be executed <br /> over the next 5 years,which is approximately W over the next 10ears, which is approximately <br /> $27.9 million per year. 10y <br /> pp y <br /> P $67.5 million per year. <br /> Coll) Smallest investment option cn <br /> a Addresses 20 percent of facility needs a Addresses all facility needs <br /> • No improvement to educational <br /> CIO) environment y No improvement to educational environment <br /> No improvement to capacity z No improvement to capacity <br /> c p p y o No new or renovated schools <br /> c� • No new or renovated schools c2 <br /> • Many facility needs not addressed Largest investment option <br /> CHCCS OPTIONS SUMMARY <br /> INVESTMENTi <br /> OPTION A $139.7 M 5 YEARS $27.9 M <br /> OPTION B $675.1 M 10 YEARS $67.5 M <br /> OPTION C $325.2 M 10 YEARS $32.5 M <br /> OPTION 0 $546.9 M 15 YEARS $36.5 M <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.