Orange County NC Website
2 <br /> constructed stormwater management practices and/or retrofits to existing facilities to help improve <br /> the quality of existing stormwater runoff from those existing facilities. <br /> The Project is a proposed retrofit to an existing facility that is located on Orange County property. <br /> An existing legacy stormwater basin located on the Gravelly Hill Middle School property was <br /> initially constructed in 2005 as a temporary sediment basin for erosion and sedimentation control <br /> purposes. The basin structure remained in place as a supplementary stormwater treatment basin <br /> upon completion of the school construction project and was never formally converted to a state- <br /> compliant permanent Stormwater Control Measure (SCM). Over the years, the existing legacy <br /> stormwater basin has become severely overgrown with native and non-native vegetation, and has <br /> experienced structural deterioration and heavy sedimentation throughout the basin structure. The <br /> Project will focus on rehabilitating and converting the existing legacy stormwater basin to a <br /> stormwater wetland in conformance with state standards (i.e., 15A NCAC 02H .1054 - Minimum <br /> Design Criteria for Stormwater Wetlands) and guidance as provided in the NCDEQ Stormwater <br /> Design Manual, Part C-4. The Project will help provide long-term water quality benefits to Orange <br /> County and will also offer an important opportunity to educate the general public and the <br /> students/staff at Gravelly Hill Middle School about stormwater management and the benefits of <br /> protecting, restoring, or constructing new wetlands within the local watershed. The Project is <br /> funded via IAIA funds as part of Orange County's ongoing membership with the UNRBA and <br /> Orange County's obligation to maintain joint compliance with the Falls Lake Rules' Existing <br /> Development requirements. <br /> On August 11, 2023, Orange County published Invitation to Bid (ITB) No. 367-005395 for the <br /> Project. On September 6, 2023, Orange County received two (2) qualified bids from licensed <br /> contractors for construction of the Project. HGS, LLC T/A RES Environmental Operating <br /> Company, LLC was the lowest responsive and responsible bidder with a bid price of$286,820.84. <br /> Attachment 2 is a copy of the Bid Tabulation for the Project. <br /> The anticipated timeline for construction completion is approximately 110 calendar days following <br /> the pending Notice of Award and dependent on weather conditions during the construction phase. <br /> The County's primary draft agreement for the Project is provided at Attachment 1. A complete <br /> copy of the draft 350-page construction agreement may be accessed at the following link: <br /> https://orangecountVnc.gov/Wetland <br /> FINANCIAL IMPACT: Through prior years budgeting and current year budgeting, the Board has <br /> appropriated sufficient budget for construction of the Project. A total of $316,188.03 is currently <br /> available to support the Project, with smaller related projects that are pending expenditures from <br /> that balance. The pending negotiated construction contract will not exceed the appropriated <br /> budget for the Project. <br /> SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to <br /> this item: <br /> • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY <br /> The creation and preservation of infrastructure, policies, programs and funding necessary <br /> for residents to provide shelter, food, clothing and medical care for themselves and their <br /> dependents. <br /> ENVIRONMENTAL IMPACT: The following Orange County Environmental Responsibility Goal <br /> impact is applicable to this item: <br />